My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7631 Gall Blvd (36)
Zephyrhills
>
Building Department
>
Building Plans
>
7631 Gall Blvd (36)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2025 12:05:23 PM
Creation date
2/18/2025 4:18:07 PM
Metadata
Fields
Template:
Building Plans
Street #
7631
Location
Gall Blvd
Building Plans - Permit #
18385
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
512
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.6.1.5.8 Walmart Contractors. Walmart Contractors shall be responsible for relating problems and anticipated <br />issues which may impede the progress of the Work and shall cooperate with Contractor. Walmart Con- <br />tractors performing Work shall abide by the compliance policies of Contractor and shall not interfere <br />with Contractor's ability to meet Compliance Requirements. <br />(a) Contractor, as the "Controlling Contractor," has the authority to remove or refuse access to any Walmart <br />Contractors failing to comply with Compliance Requirements. <br />3.6.1.6 PRECONSTRUCTION/MEETINGS <br />3.6.1.6.1 Preconstruction Meeting ("Precon Meeting"). Prior to initiation of ground -disturbing activities, Con- <br />tractor/Superintendent shall conduct and document a Precon Meeting at the Site to discuss Compliance <br />issues including topics identified in the Specifications. The Precon Meeting requires, but is not limited <br />to: <br />(a) Notice. The Contractor shall give reasonable notice of such Precon Meetings to Walmart and all appro- <br />priate governmental agencies having jurisdiction over the Site/Work, and offer them the opportunity to <br />attend. Contractor shall document such invitation(s). <br />(b) Safe . Superintendents shall ensure that all Safety Law required programs and documentation are avail- <br />able, discussed and documented as part of the Precon Meeting. This includes, but is not limited to, <br />sharing Safety Plan requirements and Lockout/Tagout programs and procedures. <br />1) The Lock Out/Tag Out portion of the Precon Meeting shall be documented on the Form to be <br />provided by Walmart. <br />2) Walmart provided Lock Out/Tag Out requirements shall be communicated to Workers. <br />(c) Waste Management: Contractor shall discuss the general, Hazardous, Universal, and recyclable waste <br />management requirements for the Project as described in the Hazardous Waste Management Plan. Con- <br />tractor shall explain the site specific requirements and responsibilities. <br />(d) Stonnwater: If a NPDES permit is required for this Project, Precon Meeting requirements under Speci- <br />fications Sec. 02370 must be complied with to discuss the permit, the SWPP and Stormwater related <br />concerns for the Project. Initial earth -disturbing Subcontractors must attend this meeting. <br />(e) Worker Verification: Superintendent shall ensure that information and training regarding access controls <br />and WV Forms, is described and made available. <br />3.6.1.6.2 Orientation Meetings. The Contractor shall conduct an Orientation meeting for all Workers prior to <br />initiation of their activities at the Project Site if they were unable to attend the Precon Meeting. Content <br />should align with Precon Meeting requirements. <br />3.6.1.6.3 Weekly Meetings. The Contractor shall hold weekly meetings with all Subcontractors working on the <br />Project Site and any persons involved in construction activities. The weekly meetings shall address <br />Compliance issues as identified in the Specifications. <br />(a) Safety. Have at least one safety meeting per week which addresses safety information pertinent to cur- <br />rent or future work. Every Worker shall attend the meetings and document attendance with a sign -in <br />sheet retained as part of the Safety Plan. <br />3.6.1.7 COMPLIANCE INCIDENT OR AGENCY SITE VISIT REPORTING AND PROCEDURES <br />3.6.1.7.1 Immediate Notice. Actual notice (voice communication, not email or voicemail) to Walmart shall be <br />made within one (1) hour to the appropriate Construction Manager when any of the following occurs: <br />(a) Spills of Chemical or Petroleum Products (or other potentially hazardous materials or waste) that equal <br />or exceed the reportable quantity; <br />(b) Safety Incidents; <br />(c) Discovery of Unforeseen Conditions that pose risk requiring a Stop Work in the area conditions exist; <br />and <br />(d) Worker Verification. <br />3.6.1.7.2 Electronic Notice. Notice to Walmart shall be made by completing an Incident Report via the electronic <br />reporting system provided by Walmart on the same date as the incident occurred. Electronic Notice <br />must be provided for: <br />(a) All items above requiring immediate notice; <br />01351-8 <br />0706 - Zephyrhills, Florida - 16592140 February 16, 2017 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.