My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7631 Gall Blvd (36)
Zephyrhills
>
Building Department
>
Building Plans
>
7631 Gall Blvd (36)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2025 12:05:23 PM
Creation date
2/18/2025 4:18:07 PM
Metadata
Fields
Template:
Building Plans
Street #
7631
Location
Gall Blvd
Building Plans - Permit #
18385
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
512
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.6.2.5 <br />HAZARDOUS MATERIALS AND HAZARDOUS WASTE. This paragraph replaces former specifica- <br />tions section 01743. Contractor shall properly manage all Hazardous Materials and Wastes present on the <br />Site, regardless of who supplied the materials or generated the waste, and comply with all applicable Com- <br />pliance Requirements. <br />3.6.2.5.1 <br />Material Selection and Use. All chemicals and other products utilized in the performance of the Work <br />must be approved for the intended use by the Federal, state and local requirements, and be fully compli- <br />ant with all Environmental Laws and Safety Laws. Contractor herby covenants and agrees that the ap- <br />plication of all chemicals and other products utilized in the performance of the Work must be performed <br />by a licensed applicator if so required under any Compliance Laws. <br />3.6.2.5.2 <br />Walmart Prohibition. Walmart, in its sole discretion, may prohibit certain chemicals or substances from <br />being utilized on Site that would otherwise be approved by Federal, state or local laws and regulation. <br />Such determination will be provided in writing to Contractor. <br />' <br />3.6.2.5.3 <br />Use and Storage of Hazardous Materials. Contractor shall properly safeguard and store any Hazardous <br />Materials present on Site so as to protect against the possibility of fire, spill, injury, fumes or other <br />damage. Contractor shall be solely responsible for all damage, cost or expense caused by the use or <br />' <br />storage of Hazardous Materials at the Project site. <br />3.6.2.5.4 <br />Hazardous Waste Management. Contractor shall have primary responsibility as the generator of all <br />Hazardous Waste at the Site and shall manage all Hazardous Waste generated on the Site. Contractor <br />shall identify all Hazardous Wastes produced and properly handle and dispose of said Hazardous Waste <br />in accordance with all applicable Compliance Laws. <br />3.6.2.5.5 <br />Hazardous Waste Vendor. Waste Management National Services, Inc. has been designated as the man- <br />' <br />datory vendor for the management and disposal of Hazardous Waste on all of Walmart's Sites. <br />3.6.2.5.6 <br />Removal of ALL Materials and Wastes. No construction chemicals, Hazardous Materials or Univer- <br />sal/Hazardous Waste shall remain at the Site upon project completion including those generated or uti- <br />lized by Subcontractors or supplied by Walmart, but shall be removed, or appropriately and lawfully <br />reused, recycled, or disposed of. Contractor will be required to remove any such items if discovered <br />after Project completion at Contractor's sole expense. <br />' <br />3.6.2.5.7 <br />Stop Work. If reasonable precautions will be inadequate to prevent foreseeable bodily injury or death <br />to persons resulting from a Hazardous Material or Hazardous Waste encountered on the Site by Con- <br />tractor, Contractor shall, upon recognizing the condition, immediately Stop Work in the affected area <br />and report the condition per the requirements in Sec. 3.6.1.7 of the Compliance Exhibit and these Spec- <br />ifications. <br />3.6.2.6 HAZARDOUS WASTE MANAGEMENT PLAN. Walmart has contracted with Waste Management, Inc. <br />to provide a site -specific Hazardous Waste Management Plan ("HWMP"). Contractor is required to purchase <br />the plan from Waste Management, Inc. and shall manage the implementation of the HWMP and ensure com- <br />pliance with all applicable Compliance Laws relating to the handling and disposal of Hazardous Materials <br />and Wastes. <br />3.6.2.6.1 Contractor may amend the provided HWMP as appropriate for the Site conditions or to align the HWMP ' <br />with existing Contractor procedures for management of Hazardous Materials and Wastes. <br />3.6.2.6.2 Contractor shall fill in the blanks on page 1 of the HWMP with the applicable personnel assigned to each <br />position, as well as the applicable telephone numbers for emergency purposes. Contractor shall have <br />this completed when work begins on the project. <br />3.6.2.7 USED TANK REMOVAL <br />3.6.2.7.1 Contractor is responsible for removal of any above ground tank (used cooking oil, TLE motor oil) during <br />' <br />the construction project and is responsible to ensure proper disposal of the tanks. <br />3.6.2.7.2 Tanks must be empty before removed from the store/club. Contractors must coordinate with vendor to <br />have the used cooking oil or TLE motor oil pumped. <br />Quest Recycling <br />1-877-321-1811 <br />01351-12 <br />0706 - Zephyrhills, Florida - 16592140 February 16, 2017 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.