Laserfiche WebLink
3.6.2.7.3 Once tank is empty it must be removed from the store/club immediately to prevent refill of the tank by <br />' store/club personnel. The tank must be stored and covered with waterproof tarps to prevent water from <br />entering the tank or washing any residue into the environment. <br />3.6.2.7.4 All tanks removed during the project may be accumulated and picked up at one time to prevent multiple <br />' pick-up charges. Once all tank removal projects are complete, contact vendor to remove and dispose of <br />tanks. <br />EP&S OF VERMONT <br />' Phone#:1-800-577-4557 <br />Email: epsvtucoprogram i%.epsofvermont.com <br />3.6.2.8 CONDITIONS OF SITE <br />' 3.6.2.8.1 Stop Work. In the event Contractor encounters Unforeseen Hazardous (or potentially hazardous) Con- <br />ditions, Contractor shall immediately stop Work in the area affected and report the condition to Owner <br />and Architect per the requirements for notice in Sec 3.6.1.7 of the Compliance Exhibit and these Speci- <br />fications. The Work in the affected area shall not thereafter be resumed, except by written agreement of <br />Owner and Contractor, until any Hazardous Material or Hazardous Waste in fact present in the affected <br />area has been disposed of, removed, abated or rendered harmless. Contractor shall be responsible for <br />' any and all Hazardous Materials brought to the site by Contractor or subcontractors. <br />3.6.2.9 ENVIRONMENTAL REMEDIATION ON PROJECT SITE. All Hazardous Waste generated as a result of <br />Project Site remediation must be handled and disposed of in compliance with the Remediation plan and all <br />applicable Compliance Laws. <br />3.6.2.10 NONHAZARDOUS DEMOLITION AND CONSTRUCTION WASTE REMOVAL AND DISPOSAL. <br />' This paragraph replaces former specifications section 01742. <br />3.6.2.10.1 Performance Goal. The waste management objective is to recycle, reuse, or salvage non -hazardous <br />waste generated by the work and to eliminate or minimize the amount of waste going to landfills. The <br />' Construction Waste Management Plan (CWMP) does not relieve Contractor of responsibility for ade- <br />quate and continuing control of pollutants and other environmental protection measures, including, but <br />not limited to the erosion and sedimentation control provisions specified in this Compliance Specifica- <br />tion. <br />3.6.2.10.2 Owner Pre -Designated Vendor. GC shall subcontract the services of the Owner pre -designated Con- <br />struction and Demolition Waste Management Vendor (Vendor) for the collection and disposal of desig- <br />nated construction and demolition waste. The pre -designated vendor shall be as follows: Waste Man- <br />agement National Accounts, Windsor, CT. Waste Management LLC (866) 338-2342, <br />oakleafcdteam@wm.com. Coordinate with Vendor for Contractor prepared pre -determination of waste <br />' and associated Vendor costs prior to bidding and reference the Construction Waste Management Esti- <br />mation Form and Guidelines thereto at the end of this Section <br />3.6.2.10.3 Coordination. <br />(a) Vendor Responsibility. <br />' I) Communicate to the job site contact what service and recycling is arranged. <br />2)Provide handling, containers, storage, signage, transportation, and other items as required to <br />implement waste management for the duration of the Contract. <br />' 3)Identify what container is for which recyclable or for trash. <br />4)Provide the waste containers to be used by the Contractor and coordinate the placement of <br />the waste containers with the Contractor. Waste containers will be classified and segregated <br />to accept materials sorted with respect to type of waste or type of material. <br />5)Provide e-business web portal with unique User -ID for Contractor to login and schedule <br />waste and recycling services. The e-business portal will submit requests made by Contractor <br />in real-time to subcontracted waste and recycling hauler(s) providing service at Project site. <br />6)Provide toll -free phone number and e-mail address for Contractor to report any issues result- <br />ing from missed services or to clarify needs at Project site. <br />' (b) Contractor Responsibility: <br />01351-13 <br />' 0706 - Zephyrhills, Florida - 16592140 February 16, 2017 <br />