My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7050 Gall Blvd (137)
Zephyrhills
>
Building Department
>
Building Plans
>
7050 Gall Blvd (137)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2025 5:25:56 PM
Creation date
2/25/2025 9:28:31 AM
Metadata
Fields
Template:
Building Plans
Street #
7050
Location
Gall Blvd
Contractor
Berglund Construction
Building Plans - Permit #
2887
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1034
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AdventHealth - Zephyrhills — Operating Room 8 & 9 Build Out 504-0253-000 <br />Zephyrhills, Florida <br />features and requirements indicated. Indicate deviations, if any, from the Work <br />specified. <br />d. Product Data, including drawings and descriptions of products and fabrication and <br />installation procedures. <br />e. Samples, where applicable or requested. <br />f. Certificates and qualification data, where applicable or requested. <br />g. List of similar installations for completed projects, with project names and <br />addresses as well as names and addresses of architects and owners. <br />h. Material test reports from a qualified testing agency, indicating and interpreting <br />test results for compliance with requirements indicated. <br />i. Research reports evidencing compliance with building code in effect for Project. <br />j. Detailed comparison of Contractor's construction schedule using proposed <br />substitutions with products specified for the Work, including effect on the overall <br />Contract Time. If specified product or method of construction cannot be provided <br />within the Contract Time, include letter from manufacturer, on manufacturer's <br />letterhead, stating date of receipt of purchase order, lack of availability, or delays <br />in delivery. <br />k. Cost information, including a proposal of change, if any, in the Contract Sum. <br />1. Contractor's certification that proposed substitution complies with requirements in <br />the Contract Documents, except as indicated in substitution request, is compatible <br />with related materials and is appropriate for applications indicated. <br />in. Contractor's waiver of rights to additional payment or time that may subsequently <br />become necessary because of failure of proposed substitution to produce indicated <br />results. <br />Architect's Action: If necessary, Architect will request additional information or <br />documentation for evaluation within seven days of receipt of a request for substitution. <br />Architect will notify Contractor of acceptance or rejection of proposed substitution within <br />seven days of receipt of request, or seven days of receipt of additional information or <br />documentation, whichever is later. <br />a. Forms of Acceptance: Change Order, Construction Change Directive, or <br />Architect's Supplemental Instructions for minor changes in the Work. <br />b. Use product specified if Architect does not issue a decision on use of a proposed <br />substitution within time allocated. <br />1.5 QUALITY ASSURANCE <br />A. Compatibility of Substitutions: Investigate and document compatibility of proposed substitution <br />with related products and materials. Engage a qualified testing agency to perform compatibility <br />tests recommended by manufacturers. <br />1.6 PROCEDURES <br />A. Coordination: Revise or adjust affected work as necessary to integrate work of the approved <br />substitutions. <br />SUBSTITUTION PROCEDURES 012500 - 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.