Laserfiche WebLink
AdventHealth - Zephyrhills — Operating Room 8 & 9 Build Out 504-0253-000 <br />Zephyrhills, Florida ' <br />j. If requested substitution involves more than one contractor, requested substitution <br />has been coordinated with other portions of the Work, is uniform and consistent, is <br />compatible with other products, and is acceptable to all contractors involved. <br />PART 2 - PRODUCTS (Not Used) <br />PART 3 - EXECUTION (Not Used) <br />END OF SECTION 01250 <br />SUBSTITUTION PROCEDURES 012500 - 4 <br />