AdventHealth - Zephyrhills — Operating Rooms 8 & 9 Build Out 504-0253-000 <br />Zephyrhills, Florida <br />SECTION 013300 - SUBMITTAL PROCEDURES <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A. Drawings and general provisions of the Contract, including General and Supplementary <br />Conditions and other Division 01 Specification Sections, apply to this Section. <br />1.2 SUMMARY <br />A. Section Includes: <br />1. Submittal schedule requirements. <br />2. Administrative and procedural requirements for submittals. <br />B. Related Requirements: <br />1. Section 017700 "Closeout Procedures" for submitting closeout submittals and <br />maintenance material submittals. <br />2. Section 017823 "Operation and Maintenance Data" for submitting operation and <br />maintenance manuals. <br />3. Section 017839 "Project Record Documents" for submitting record Drawings, record <br />Specifications, and record Product Data. <br />1.3 DEFINITIONS <br />A. Action Submittals: Written and graphic information and physical samples that require <br />Architect's responsive action. Action submittals are those submittals indicated in individual <br />Specification Sections as "action submittals." <br />B. Informational Submittals: Written and graphic information and physical samples that do not <br />require Architect's responsive action. Submittals may be rejected for not complying with <br />requirements. Informational submittals are those submittals indicated in individual Specification <br />Sections as "informational submittals." <br />1.4 SUBMITTAL SCHEDULE <br />A. Submittal Schedule: Submit, as an action submittal, a list of submittals, arranged in <br />chronological order by dates required by construction schedule. Include time required for <br />review, ordering, manufacturing, fabrication, and delivery when establishing dates. Include <br />additional time required for making corrections or revisions to submittals noted by Architect <br />and additional time for handling and reviewing submittals required by those corrections. <br />1. Coordinate submittal schedule with list of subcontracts, the schedule of values, and <br />Contractor's construction schedule. <br />SUBMITTAL PROCEDURES 013300 - 1 <br />