My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7050 Gall Blvd (137)
Zephyrhills
>
Building Department
>
Building Plans
>
7050 Gall Blvd (137)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2025 5:25:56 PM
Creation date
2/25/2025 9:28:31 AM
Metadata
Fields
Template:
Building Plans
Street #
7050
Location
Gall Blvd
Contractor
Berglund Construction
Building Plans - Permit #
2887
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1034
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AdventHealth - Zephyrhills — Operating Rooms 8 & 9 Build Out <br />Zephyrhills, Florida <br />504-0253-000 <br />2. Initial Submittal: Submit concurrently with startup construction schedule. Include <br />submittals required during the first 60 days of construction. List those submittals required <br />to maintain orderly progress of the Work and those required early because of long lead <br />time for manufacture or fabrication. <br />3. Final Submittal: Submit concurrently with the first complete submittal of Contractor's <br />construction schedule. <br />a. Submit revised submittal schedule to reflect changes in current status and timing <br />for submittals. <br />4. Format: Arrange the following information in a tabular format: <br />a. Scheduled date for first submittal. <br />b. Specification Section number and title. <br />C. Submittal Category: Action; informational. <br />d. Name of subcontractor. <br />e. Description of the Work covered. <br />f. Scheduled date for Architect's final release or approval. <br />g. Scheduled dates for purchasing. <br />h. Scheduled date of fabrication. <br />i. Scheduled dates for installation. <br />j. Activity or event number. <br />1.5 SUBMITTAL FORMATS <br />A. Submittal Information: Include the following information in each submittal: <br />1. Project name. <br />2. Date. <br />3. Name of Architect. <br />4. Name of Contractor. <br />5. Name of firm or entity that prepared submittal. <br />6. Names of subcontractor, manufacturer, and supplier. <br />7. Unique submittal number, including revision identifier. Include Specification Section <br />number with sequential alphanumeric identifier; and alphanumeric suffix for <br />resubmittals. <br />8. Category and type of submittal. <br />9. Submittal purpose and description. <br />10. Number and title of Specification Section, with paragraph number and generic name for <br />each of multiple items. <br />11. Drawing number and detail references, as appropriate. <br />12. Indication of full or partial submittal. <br />13. Location(s) where product is to be installed, as appropriate. <br />14. Other necessary identification. <br />15. Remarks. <br />16. Signature of transmitter. <br />B. Options: Identify options requiring selection by Architect. <br />SUBMITTAL PROCEDURES 013300 - 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.