My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
91-1915
Zephyrhills
>
Building Department
>
Permits
>
1991
>
91-1915
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2009 9:42:08 AM
Creation date
4/11/2006 2:20:55 PM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Building Department - Date
11/6/1991 12:00:00 AM
Permit #
91-1915
Building Department - Name
TREE HANN INC
Address
39345 6TH AV
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />STANDARD FORM OF AGREEMENT <br />BETWEEN CONTRACTOR AND OWNER <br /> <br />. THIS AGREEMENT made the 7/I;A'TI- f-:J;/~',:;'T- ~ of ~''i <br />Nineteen Hundred and /VIIVEf/'{/v(;~- .. by and between req €...Ae <br />hereinafter called the Contractor, and -/ ;f.'-E.{~ 1!/1t..){fl / Nfl ' <br />Owner, Witnesseth, that the Contractor and the Owner for the considerations named agree as follows: <br /> <br />i" the year <br /> <br />hereinafter called the <br /> <br />ARTICLE 1. SCOPE OF THE WORK <br /> <br /> <br />and perlorm all of the work shown on the Drawings and described in the Specifications <br />, j', <br /> <br />acting as and in these <br />, and shall do everything required by this agreement, the general conditions of the Contract, the <br /> <br />ARTICLE 2. TIME OF COMPLETION ') <br />The work to be performed under this Contract shall be commenced AS ~n Cl.<; t-ebl/)'\I+ j<, <br />substantially completed WITH-IN CN6""~.F k. <br /> <br />~ <br />\e.(~..le'0e~ <br /> <br />~nd shall be <br /> <br />ARTICLE 3. THE CONTRAcr SUM <br />The Owner shall <br />funds as follows. <br /> <br /> <br />'ons provided therein, in current <br /> <br />Authorized Change Orders will be submitted by the Contractor for all work not specifically included in this Contract <br /> <br />ARTICLE 4. PROGRESS PAYME.NTS <br /> <br />(Insert here any provision made for the amount retained after the work reaches a certain stage of completion.) <br /> <br />ARTICLE 5. ACCEPTANCE AND FINAL PAYMENT <br /> <br />Final payment shall be due --r}+H day, ~ substantial completion of the work provided the work be then fully completed <br />and the Contract fully perlormed. <br /> <br />ARTICLE 6. THE CONTRACT DOCUMENTS <br /> <br />The General Conditions of the Contrac~, the Specifications and the Drawings, together with this Agreement, form the Contract, and they <br />are as fully a part of the Contract as if hereto attached or herein repeated. The following is an itemization of other essential pertinent <br />information: <br /> <br />" <br /> <br /> <br />)/j~, <br /> <br />,,?? 1 <br />:i /"1/.-. /) )..,~'-/I,~,,,..../ <br />Owner <br /> <br />-../1-/..2... <br /> <br />/"1) <br /> <br /> <br />)/ <br /> <br />SEMINOL.E FORM 41 ~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.