My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
92-2555
Zephyrhills
>
Building Department
>
Permits
>
1992
>
92-2555
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2009 9:55:54 AM
Creation date
4/24/2006 11:13:47 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Building Department - Date
7/24/1992 12:00:00 AM
Permit #
92-2555
Building Department - Name
Z F M PARTENERS
Address
39336 CHANCEY RD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />MAYOR <br />James A. Bailey <br /> <br />CITY COUNCIL <br />Doris C. Smith <br />Pre&ident <br /> <br />John H. Geiger <br />VICe President <br /> <br />Clyde C. Bracknell <br /> <br />Alan L. Brenia <br /> <br />Carlton C. Galster <br /> <br />Nick Nicholl <br />City Manager <br /> <br />Linda D. Boan <br />City Clerk <br /> <br />Thomas P. MeAlvanah <br />City Attorney <br /> <br />STATE OF FLORIDA <br /> <br />City of Zephyrhills <br /> <br />5335 Eighth Street <br /> <br />PASCO COUNTY <br />ZephyrhillsJ Florida 33540 <br /> <br />(813) 788-2313 <br /> <br />July 24, 1992 <br /> <br />Jerry Zuppa <br />zephyrhi11s Flea Market <br />39336 Chancey Road <br />Zephyrhi11s, Florida 33540 <br /> <br />RE: Sharing of Costs for Off-Site Water Line <br /> <br />sirs: <br /> <br />We have reviewed the cost estimates for construction of a 12 <br />inch water line and an 8 inch water line from Sam Pasco Park <br />to your site on the south side of the East Zephyrhills <br />Bypass prepared by R. L. poynter Construction, Inc. <br /> <br />We believe that the cost estimates for a 12 inch water line <br />are excessive. The unit cost for ,12" DR-1S pipe installed <br />is $14.25. The City is currently laying the same size and <br />type of pipe on Fort King at a cost ,of $10.50 per linear <br />foot. Wal-Mart installed the same 12 inch pipe on Pretty <br />Pond in May, 1992 at a unit cost of $10.50 per linear foot. <br />Based on these two recent experiences, we believe that <br />$10.50 per linear foot is a reasonable cost. <br /> <br />Schedule B for a 12 inch line should also be amended to <br />eliminate item 8 (cut and patch existing drive) because the <br />City has already provided a 20 inch sleeve under that <br />driveway which can be used for a 12 inch water line. <br /> <br />With the above changes the estimated costs' to construct a 12 <br />inch line on the north side of the bypass'is: <br /> <br />1260 LF of 12" DR-1S @ $10.50 <br />Various fittings <br />120 LF of 8" @ $8.50 <br /> <br />$13,230 <br />4,075 <br />1, 020 <br />$18,325 <br /> <br />This estimate does not include the cost of boring under the <br />roadway which '\Ali11 be done by the City. You will be <br />responsible for field-locating the point-af-crossing. <br /> <br />The estimated costs to extend an 8 inch water line to your <br />site on the south side of the Bypass is $12,340. <br /> <br />Based on these estimates, the City will reimburse you for <br />the excess costs attributable to a larger line (12 inch) in <br />a different alignment (north side of Bypass) for the City's <br />advantaqe. Our estimate of reimbursement is $5,985. Actual <br />
The URL can be used to link to this page
Your browser does not support the video tag.