Laserfiche WebLink
<br />Page Two <br />J. Zupka <br />July 23, 1992 <br /> <br />reimbursement will be based on an engineer's certification <br />of actual costs of the as-built water line. <br /> <br />The City will also credit 50% of the remaining costs (estimated to <br />be $12,340) toward your water connection fees ('estimated to be <br />$2,318.75). Any excess credit will be reimbursed to you. <br /> <br />SUMMARY OF ESTIMATES <br /> <br />Cost of 12" line <br />Cost of 8" line <br />Reimbursement from City <br /> <br />50% credit for cost of 8" line <br /> <br />$18,325.00 <br />- $12,340.00 <br />$ 5,985.00 <br /> <br />$ 6,170.00 <br /> <br />$ 6,170.00 <br /> <br />- $.-2 " J 18 . 7 5 -..2 '" 3 Iv ~ ..")() <br />$3 ,.8~1. 2,::; 3/ YO 7. 5'[;' <br /> <br />Estimated Net Cost to Developer of Off- <br />Site Water Line <br />Water Connection Fees <br />Reimbursement from City <br /> <br />All estimates must be confirmed by the, Engineer of Record after <br />construction. If there is a substantial delay between <br />construction of the water line and construction of the flea market <br />building, the two reimbursements could be approved at different <br />times. ' <br /> <br />Call me at 788-2313 if you have any question on this subject. <br /> <br />Sincerely, <br /> <br />1{:t/l ~..J~ <br /> <br />F~oyd . ~ichols <br />C~ty anager <br /> <br />cc: Roy Burnside, Building Official <br />Louie Sellars, Supt. of Utilities <br /> <br />'attachment (3) <br />