Laserfiche WebLink
<br />.-. ;..,,";.:-". <br />.;,.~ .-'ii7.'....1..~ <br /> <br />.-- .~..;,_.;L:... ....:'.~:/;~j:~-'.~.~-~._~:~; ...Ji..... <br /> <br />r < <br />~~__._ _.__...!___ .__..__~... ..:_____.._____---.-----.-....1-- <br /> <br />..', ,--- -------~ <br /> <br />-- <br /> <br />x <br />( ~t:t-V, /" <br />Y ./, <br />~1> i f"~) <br />B;~// <br /> <br />(- <br /> <br />Jee-.1 D-/;l-93 <br />c.u 7 r 2,P"l) <br /> <br />To: <br /> <br />Roy Burcnsi'del ~ <br /> <br />cc: <br /> <br />Chief Fenton <br /> <br />From: sid Maxwell ... -. <br /> <br />''\--- :. <br /> <br />Date: 5-11-93 <br />Subject: C.O. for Phase I and Phase II of Permit No. 3210 B <br /> <br />=------ --:.- <br /> <br />-' <br /> <br />--=- <br /> <br />I am writing this letter to clarify tlie - two phases of our <br />project as discussed at the time of permitting. Please let me know <br />of any problems or comments that you or Chief Fenton may have <br />concerning each phase of the project. The two phases are as listed <br />below: <br /> <br />Phase I <br /> <br />The first phase of the project will consist of installing the <br />equipment needed to produce still water (uncarbonated) in a PET <br />bottle. This will consist of operating all packaging equipment and <br />the following items for water processing: <br /> <br />Crown Cork and Seal Filler <br /> <br />Carbo Cooler <br /> <br />Contact Tank <br /> <br />Filtration Equipment <br /> <br />Water Pumps <br />Nitrogen system <br /> <br />Description of operation - The process for producing still water <br />PET products is the same as the process previously used for <br />producing that product, with the .exception of using Nitrogen to <br />force the water into the bottle rather than letting the water <br />gravity flQW into the bOttle. The process begins as water leaves <br />the spring water storage tank. The water is pumped through <br />particulate filters, a U.V. light and into a ozone contact tank. <br />_~. After ozonation the water is pumped through the carbO cooler and <br />into the filler. This phase of the project will not use carbOn <br />dioxide, ammonia, or steam (boiler) and at the time of the <br />Certificate of Occupancy for phase I none of these items gases will <br />be onsite. During the start up of phase I, however, construction <br />of the boiler, refrigerati-on and CO2 systems will continue. <br />Electrical installation will also continue on packaging equipment <br />which will be used for phase II. No C02 or ammonia will be brought <br />on site without notifying the fire department. <br />