Laserfiche WebLink
<br />1:' ""'~~-:- , ~----- <br /> <br />,/ .- f <br /> <br />(' <br /> <br />Phase II <br /> <br />The second phase of the project will consist of producing a <br />flavored and carbonated produc;.t called Ice Mountain in a glass <br />container. ; Thi~ will consist of operating all packaging equipment <br />and the following items for water processing: <br />r ~ -~ <br /> <br />Crown Cork andLSeal 'piller <br /> <br />Carbo Cooler <br /> <br />Contact Tank <br /> <br />Filtration Equipment <br /> <br />Wate:r: Pumps <br />Ammonia System <br />Boiler system <br /> <br />C02 system <br />High Fructose Corn Syrup (HFCS 55) <br /> <br />,~ <br />.,- <br /> <br />Description of operation - The certificate of occupancy for phase <br />II will consist of issuing a final for the project. This phase <br />will have all equipment operating and will also include final <br />inspection of the building modifications. The production of the <br />-Ice Mountain beverage will consist of filtering spring water and <br />mixing the water with a flavored syrup to produce the final <br />product. The product will then be chilled down at the carbo cooler <br />and carbon dioxide will be dissolved in the cool water. The <br />product will then go to the filler and be bottled. C02 instead of <br />nitrogen, as with the still water, will be used to force the <br />beverage into the bottles. <br /> <br />The sta~t up of both phases of this project are on a critical <br />timeline so that we do not short our customers of product. In <br />order to solve any issues prior to the date when we need occupancy <br />for each phase,'we would like to ask you and Chief Fenton to visit <br />the plant as much as possible and let us know of anything which is <br />irregular., We will ask for a final inspection one week prior to <br />our start up date so that we can work out any issues ahead of time. <br />Thank you for yo~ time and please let me knQW of any information <br />that I may get for you regarding this project. <br />