Laserfiche WebLink
<br /> <br />ZEPHYRHILLS SENIOR CENTER <br />4645 AIRPORT ROAD, ZEPHYRHILLS <br /> <br />PAGE THREE <br /> <br />ITEM #5: <br />complete tear orr and haul away or existing gravel roor, approximately 80 <br />(eighty) squares. Install new 1" (one inch) perlite insulation, to be covered <br />with 75 lb. (seventy-rive pound) base sheet and 3-ply riberglass. Mop down <br />system with I-coat Fibered emulsion and 1-rinal coat Aluminum Silver coating. <br />All gravel stop to be replaced with new 26 GA Galvanized drip edge. Install <br />new lead boots on roor. All AIC units and rans to be rerlashed. Cut out <br />existing plaster. Install new L rlashing, nail on new wire lathe and plaster <br />walls over rlashing to match existing texture. <br /> <br />ITEM #6: <br />Pour concrete around existing slab at side entrance to create a ramp into the <br />building. Concrete will be poured from existing elevation out in two <br />directions approximately 6' (six feet) to create a grade or no more than 1" <br />(one inch) in 12" (twelve inches) of travel. <br /> <br />ITEM #7: <br />Front foyer will have existing recessed ceiling fixtures removed and 4 (four) <br />new surface mount, rour (4) - 40 watt bulb fluorescent rixtures installed. Any <br />drywall ceiling repair's from removal to be included. <br /> <br />ITEM #8: <br />The enlarging of the Women's Bathroom to three (3) stalls, the new stall to be <br />set up for handicapped access. The bathroom will be enlarged by extending the <br />common wall between the men's and women's bathrooms to intersect the extension <br />of the wall perpendicular to it, running toward the front door. These walls to <br />be of frame and one-half (112") inch drywall. The new stall walls will match <br />the existing as close as possible. They will be adjacent to the existing <br />sinks. The new door location will be in the existing wall racing the hall. <br />The concrete floor will be opened to tie in the plumbing, repoured with <br />concrete and the entire floor retiled with eight (8") standard ceramic tile and <br />grout. The walls on the inside of the bath and the new external walls will be <br />painted to match. Air conditioning ducts will be run to both baths and any <br />necessary drops to enclose this duct work will be included. Cold air returns <br />are to be cut into the bathroom door. <br /> <br />ITEM #9: <br />The Men's Bathroom floor will be retiled with eight (8") inch standard ceramic <br />tile and grout. Air conditioning duct will be run to this bathroom also, and <br />if any drops are necessary to enclose this ductwork, they are to be included. <br />Cold air returns are to be cut into the bathroom door. <br /> <br />ITEM #10: OPTIONAL - SEPARATE FROM BID <br />Install automatic double glass doors in front entry. <br />