Laserfiche WebLink
<br />The total price including tax for the work covered herein is forty two thousand four hundred thirty <br />eight dollars and no cents ($42,438.00). Terms of payment are net 30 days. <br />EXCLUSIONS: <br />1. Unforeseen underground conditions. <br />ALTERNATES: <br />1. Disposal of sludge, waste fuel, water and cleaning debris: Three drums of oily water and <br />debris disposal is approximately $1,725.00 . Alternatively, the liquids may be processed <br />through the recycfled fuels program. Billing to be at actual cost plus 20%. <br />2. Loading, transporting and disposing of approximately 50 tons of diesel contaminated soil is <br />estimated at $65.00 per ton or approximately $3,250.00. Minimum charges may apply. <br />Billing to be at actual cost plus 20%. <br />3. Electrical is estimated at $2,199.00. In the event the actual electrical costs are less than <br />estimated, the difference will be deducted at time of final invoicing. <br /> <br />Sincerely, <br /> <br />&2o-fZUfJ~ <br /> <br />Edward Vehling <br /> <br />,'. <br /> <br />C:\WPWIN60\pROPOSAL\GTEZEPH2.AI2 <br /> <br />October 12. 1994 <br />