Laserfiche WebLink
<br /> CUM TOTAL <br /> INTERIOR (CONTINUED) <br />SPEC ## WORK AND DESCRIPTION LOCATION <br />78n9/80 CABINETS - KITCHEN/COUNTER TOP <br /> Remove existing Kitchen cabinets. <br /> Furnish and install new Kitchen <br /> cabinets with counter top in <br /> accordance with the plans. (Owner to <br /> sign off on final cabinet plans prior to <br /> ordering cabinets). KITCHEN <br /> (SEE PLAN) <br />81 CLOSETS <br /> Construd a closet to house the <br /> new required A.C., A.H.U. <br /> Partitions to be 2" x 4" with 1/2" G.W.B. <br /> each side. All joints taped. Include a <br /> new 1/6 x 6/8 wood louver door <br /> per plan. (Verity size to AlC A.H.U. unit <br /> requirements). <br /> Construd new clothes closet per plan. BEDROOM NO.1 <br /> BEDROOM NO.2 <br /> BEDROOM NO.3 <br />82 ELECTRICAL WORK <br /> Install new wall outlet(s). <br /> See plan for locations. Re-circuit <br /> to new panel. KITCHEN (3) <br /> KITCHEN (220)(1) <br /> LIVING ROOM (2) <br /> FOYER (3) <br /> BEDROOM NO.1 <br /> AND CLOSET (3) <br /> BEDROOM NO.2 <br /> BEDROOM NO.3 <br /> WID CLOSET (220)(1) <br /> Install new GFCI outJet(s). <br /> See plan for locations. Re-circuit <br /> to new panel. KITCHEN (1) <br /> BATH NO.1 (1) <br /> BATH NO.2 (1) <br /> BATH NO.3 (1) <br /> WID CLOSET (1) <br /> Convert existing outlet(s) to GFCI. KITCHEN (3) <br /> Install new hard wired smoke detedor(s). HAll (1) <br /> KITCHEN (1) <br /> <br />PAGE TOTAL <br /> <br />CUM TOTAL <br /> <br />Lenora Stokea . Unit 2 <br /> <br />Revised March 7,1995 <br />