Laserfiche WebLink
<br /> CUM TOTAL <br /> INTERIOR (CONTINUED) <br />SPEC # WORK AND DESCRIPTION LOCA TION <br />82 ELECTRIC WORK (CONTINUED) <br /> Re-wire as required the entire unit to <br /> code per the proposed floor plan. <br /> Furnish all outlets, switches and light <br /> fixtures indicated. Wire from new panel <br /> location with separate metering at <br /> main service entrance. ENTIRE UNIT <br /> (SEE PLAN) <br /> Re-wire re-Iocated water heater to code. WID CLOSET <br /> Install new panel for Unit 2 only. KITCHEN <br /> Install a new dryer vent to code. (To <br /> attic and to exterior in soffit). WID CLOSET <br /> Install a new range vent hood (ductless). KITCHEN <br /> Install new ceiling fanes) with lights. <br /> Include switching as indicated. LIVING ROOM (1) <br /> BEDROOM NO.1 (1) <br /> BEDROOM NO.2 (1) <br /> BEDROOM NO.3 (1) <br /> Install new ceiling lights with switches. BEDROOM NO.1 <br /> CLOSET (2) <br /> HALL (1) <br /> KITCHEN (2) <br /> FOYER (1) <br />83 H.V.A.C. <br /> Install a new 2.5T central heating and <br /> air condition system complete with <br /> all control and electrical. (Minimum <br /> SEER required - 10.0) 10KW heat <br /> strip. Standard air cooled condensing <br /> unit set on a concrete pad. (Heat pump <br /> not required) Include all A.C. ductwori( <br /> supply and returns as required. ENTIRE UNIT <br /> Remove existing A.C. equipment <br /> and ductwori(. ENTIRE UNIT <br /> <br />PAGE TOTAl <br /> <br />CUM TOTAL <br /> <br />Lenora Stokes. Unit 2 <br /> <br />Revised March 7,1995 <br />