Laserfiche WebLink
<br />BUILDING PERMIT .... <br /> <br />CITY OF ZEPHYRHILLS Permit Nt <br />(813) 788-6611 <br /> <br />.,- <br /> <br />-;-517~ <br />9- ~- 7.~ <br /> <br />~/ <br /> <br />;10 <br />ELECTRICAL <br /> <br />Date <br /> <br />Property Owner: <br />Job Address: <br />Parcel I. D. # <br /> <br />~- <br />~~1i;~'~1-J~~ #" 11-19 <br /> <br />~sewerconn <br />Water Conn: <br /> <br />Water Meter: <br />T,I.F.'s: <br /> <br />Zoning: <br />Description of Work <br /> <br />Energy Code: <br />U)~- <br /> <br />Radon Gas: <br /> <br />cX/./77~ jP1 <br /> <br />.4r/JA--/ <br /> <br />NO OCCUPANCY BEFORE C.O. <br /> <br />FINAL / / - 3 ~.... tp.J <br />DATE <br /> <br />Complete Plans, Specifications and Fee Must Accompany Application. <br />All work shall be performed in accordance with City Codes and Ordinances. <br /> <br />c.o. <br /> <br />DATE <br /> <br />Valuation or <br />Contract Price <br /> <br />Inspector <br /> <br />A c;> <br />Permit Fee r?( (.J. - <br />Signature~ _~~ <br />Company <br />Address / <br />Telephone# V '70 Y - J a- 8" - ~O <9 C) <br /> <br /> <br />City License Registration # 1. 0 7 ~ <br />State Certified License# E. 00009 <br /> <br />Ftr. <br />Pre SLB <br />Lintel <br /> <br />L-;TY)~fjJ~ GlJl~ {~ <br />~UI~ 6CTRI((~ <br /> <br />Tp. Servo <br />Rough In <br />Meter Can <br /> <br />Const. Pole <br />Pool <br />Pre-Meter <br />Final <br /> <br />PLU~-'" <br />..- <br /> <br />(~. <br /> <br />FRM. <br />Insul. CL <br />WL <br /> <br />SLB <br />Tub Set <br />Water <br />Sewer <br />Final <br /> <br />MECHANICJi.1 <br />--- <br /> <br />Breakers <br />Ducts Insl. <br />Compressor <br />Final <br /> <br />Driveway <br /> <br />REINSPECTION FEES: When extra inspection trips are necessary due to anyone of the following reasons, a <br />charge of Fifteen and 00/100 Dollars ($15.001 shall be made for each trip for each trade: <br /> <br />a. Wrong Address <br />b. Condemned work resulting from faulty construction. <br />C. Repairs or corrections not made when inspection called. <br />d. Work not ready for inspection when called. <br />e. Permit not posted on job site. <br />f. Plans not at job site. <br />g. Work not accessible. <br /> <br />The payment of inspection fees shall be made before any further permits will be issued to the person owning <br />same. <br />