Laserfiche WebLink
<br />.~....~.;..,~::. <br /> <br /> <br />E. General Requirements, <br />Drywall/Steel Studs, Electric, and Metal <br />supplied by CONTRACTOR; <br />F. architectural drawings to be prepared by John White, <br />Architect, Brooksville, Florida, for design of the concrete slab on <br />which the T-Hangars will be erected; <br />G. site engineering plans and drawings to be supplied <br />by Civil-Tech, Inc. of Brooksville, Florida, engineer for the <br />project for the building footprint only. All other site <br />engineering is to be done by the OWNER. <br />III. CONSTRUCTION PRICE AND COST OF CONSTRUCTION FUNDS The <br />total price for the construction to be paid by the OWNER to the <br />CONTRACTOR is the sum of One Hundred Sixty-Eight Thousand six <br />Hundred and No/100 Dollars ($168,600.00) to be paid not later than <br />thirty (30) days after substantial completion of the work to be <br />performed by the CONTRACTOR and issuance of Certificate of <br />Occupancy. <br /> <br />Sitework, <br />Building <br /> <br />Concrete, <br /> <br />spec sheets <br /> <br />is <br /> <br />to be <br /> <br />hree-qua <br />erest ra e change on <br />il the date <br /> <br /> <br />full <br /> <br />TIME FOR COMPLETION OF CONSTRUCTION Construction of the <br />work to be performed by the CONTRACTOR shall be completed within <br /> <br />St'~ <br /> <br />2 <br />