My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
96-5887
Zephyrhills
>
Building Department
>
Permits
>
1996
>
96-5887
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2009 2:50:48 PM
Creation date
7/18/2006 11:13:00 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
96-5887
Building Department - Name
Z-AIRPORT AUTHORITY
Address
39450 SOUTH AV
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~=--,--'" <br /> <br />one hundred twenty <br /> <br />(120 ) <br /> <br />days from the commencement of <br /> <br />construction. <br />V. Construction will commence when all required permits have <br />been obtained in order for the CONTRACTOR to proceed with the work. <br />VI. Obligations of the respective parties to obtain permits <br />necessary for commencement of construction are as follows: <br />A. CONTRACTOR is required to obtain the building permit <br />and authorization or permit from Southwest Florida Water Management <br />District necessary for the commencement of construction; <br />B. all other permits required in connection with the <br />work and commencement of the work shall be supplied by the OWNER. <br />C. CONTRACTOR will not be required to pay impact fees <br />or permitting fees to the City of Zephyrhills. <br />VII. WARRANTIES AND OBLIGATIONS OF THE CONTRACTOR The <br />warranties and obligations of the CONTRACTOR with reference to its <br />obligations under this agreement are as follows: <br />A. that the materials, equipment, and workmanship <br />furnished under the contract will be completed in accordance with <br />the contract documents and requirements of the project architect <br />and engineer; <br />B. that the costs of the work will be completely paid <br />for by CONTRACTOR prior to the time the OWNER is required to pay <br />the contract fee. Affidavit of full completion of construction and <br />payment of all costs of the work will be submitted by the <br />CONTRACTOR to the OWNER prior to payment of the contract price; <br /> <br />&f2/J <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.