Laserfiche WebLink
<br />SCHAPER R<9<9FING,INC <br />11250 S. Hwy. 98, Dade City, Florida 33525 Phone: 352-567-8580 Fax 352-567-7073 <br />STATE REGISTERED BUILDING AND ROOFING CONTRACTOR # RB0032524, RC0056763 . . <br />serv~FLori.da)yF~tf.O'mM' &- B~S~1976 <br /> <br />3/14/00 <br /> <br />First Christian Church <br />6040 8th Street <br />Zephyrhills, FL 33540 <br />Phone: 813-782-1071 <br /> <br />Attention :Mr. Lowell Humphreys <br /> <br />Project: Main Sanctuary <br /> <br />Supply labor, materials, and supervision, as needed to: <br />REMOVE ROUND SKYLIGHTS. SKYLIGHT MOUNTING AND <br />REWORKING OF ROOF STRUCTURE <br /> <br />PREPARATION AND ROOF REl\'[OVAL <br />. _Procure permits, plans, and engineering <br />. Cover and protect work areas <br />. Remove skylights and roof framing to lower roof section <br />. Remove round roof sections and round gable sections <br />. Rough frame gable ends to blend into existing walls <br /> <br />ROOF FRAME <br />. Rough frame gable ends to blend into existing walls <br />. Frame new gable type roof structure to tie into existing shingle roof area <br />. Match existing roof pitch <br />. Match framing members and decking with similar products <br />. Insulate with R - 19 batt insulation <br />. Repair hidden damage ( if found) at a time and material basis. Labor is 536,00 per man-hour, Material <br />is marked up 20% contractors fee. <br />. Dry-in all new roof area with 30 lb. felt paper <br /> <br />ROOFING <br />. Install metal flashings as needed <br />. Install roof shingles ( 25 year 3 tab fiberglass) on newly framed roof section <br />. Install 20 - 24" x 30" metal curbed skylights, with tinted argon filled insulated solar glass in new framed <br />roof section balancing where existing skylights were <br /> <br />structural first christian z-hills.wps <br /> <br />Page - 1 of2 <br /> <br />/rc=;r ~ ~\ --/"~ <br /> <br />Ey: ~~\p~~n, CONTP~CTOR <br />