My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
00-9500
Zephyrhills
>
Building Department
>
Permits
>
2000
>
00-9500
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2006 7:12:05 AM
Creation date
9/14/2006 11:38:09 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
00-9500
Building Department - Name
CHRISTIAN CHURCH
Address
6040 8TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />SCHAPER R<9<9FING,INC <br />11250 S. Hwy. 98, Dade City, Florida 33525 Phone: 352-567-8580 Fax 352-567-7073 <br />STATE REGISTERED BUILDING AND ROOFING CONTRACTOR # RB0032524, RC0056763 . . <br />serv~FLori.da)yF~tf.O'mM' &- B~S~1976 <br /> <br />3/14/00 <br /> <br />First Christian Church <br />6040 8th Street <br />Zephyrhills, FL 33540 <br />Phone: 813-782-1071 <br /> <br />Attention :Mr. Lowell Humphreys <br /> <br />Project: Main Sanctuary <br /> <br />Supply labor, materials, and supervision, as needed to: <br />REMOVE ROUND SKYLIGHTS. SKYLIGHT MOUNTING AND <br />REWORKING OF ROOF STRUCTURE <br /> <br />PREPARATION AND ROOF REl\'[OVAL <br />. _Procure permits, plans, and engineering <br />. Cover and protect work areas <br />. Remove skylights and roof framing to lower roof section <br />. Remove round roof sections and round gable sections <br />. Rough frame gable ends to blend into existing walls <br /> <br />ROOF FRAME <br />. Rough frame gable ends to blend into existing walls <br />. Frame new gable type roof structure to tie into existing shingle roof area <br />. Match existing roof pitch <br />. Match framing members and decking with similar products <br />. Insulate with R - 19 batt insulation <br />. Repair hidden damage ( if found) at a time and material basis. Labor is 536,00 per man-hour, Material <br />is marked up 20% contractors fee. <br />. Dry-in all new roof area with 30 lb. felt paper <br /> <br />ROOFING <br />. Install metal flashings as needed <br />. Install roof shingles ( 25 year 3 tab fiberglass) on newly framed roof section <br />. Install 20 - 24" x 30" metal curbed skylights, with tinted argon filled insulated solar glass in new framed <br />roof section balancing where existing skylights were <br /> <br />structural first christian z-hills.wps <br /> <br />Page - 1 of2 <br /> <br />/rc=;r ~ ~\ --/"~ <br /> <br />Ey: ~~\p~~n, CONTP~CTOR <br />
The URL can be used to link to this page
Your browser does not support the video tag.