Laserfiche WebLink
<br />., <br /> <br />SCHAPER Rc9c9FINGJINC <br /> <br />11250 S. Hwy. 98, Dade City, Florida 33525 Phone: 352-567-8580 Fax 352-567-7073 <br />STATE REGISTERED BlTILDING AND ROOFING CONTRACTOR # RB0032524, RC0056763 <br />Se.l'il~ f1,oYid.;;t; ~ F~ ff.0"I?1..et' & '8~ 5 ~ 19 76 <br /> <br />3/14/00 <br /> <br />FINISHES <br />· Install ceiling density drywall bottom of new gable roof structure to form cathedral type ceiling <br />at old skylight location <br />· Blend drywall finishes into existing ceiling and walls as possible <br />· Rebuild gable end walls to match existing structure and finishes <br />· Blend stucco into existing stucco work as architecturally possible <br />· Paint new wall and ceiling areas to match existing <br />· Prime and paint to existing gables and disturbed trims <br /> <br />Our quote does not include: ,Interior repairs, painting, electrical, plumbing, sod, landscaping, HV AC, <br />concealed damages or any work not specifically mentioned above. <br /> <br />SPECIAL NOTE: Changes made after the approval of this agreement shall be done by a written change order. <br />All change orders shall be due in full at time of approval. <br /> <br />CONTR-'\CTOR W A.RRANTY: Upon completion of the work and payment of all monies owed. Contractor <br />shall issue a 5 year warranty for materials and workmanship will be issued by the contractor for the new shingle <br />portion of the roof A manufacturers warranty for twenty-five years will be issued by GAF for the shingles. <br /> <br />GENER..\L CONDITIONS: All work shall be carefully supervised and completed by workmen skilled and <br />knowledgeable in methods needed to produce high quality work. The job site shall be kept clean daily for the <br />duration of the job and the grounds shall be left clean of all roof related debris after completion. The yard shall <br />be swept with a magnet. Collection costs if any, together with interest shall be added to the contract price if <br />payment default occurs. Permit, Workman Compensation, and General Liability insurance shall be provided by <br />the Contractor. Carpentry, authorized change orders and work which is not covered under the scope of work <br />outlined herein shall be performed on a time and materials basis unless otherwise agreed upon. <br /> <br />TOT -'\L AGREE UPON PRICE: <br /> <br />542,622.00 <br /> <br />Terms: 20% at acceptance, 25% at 1/2 tearoffand roof frame, 25% at 2nd tearoffand dry-in, 20% at roof and <br />exterior siding completion, 10% at completion. <br /> <br />Paul Schaper <br />Contractor <br /> <br />I accept the above price and terms. You are authorized to commence work. <br /> <br />Date: <br /> <br />Signed <br /> <br />structural first christian z-hiIls. wps <br /> <br />Page - 2 of2 <br />