My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
01-0272
Zephyrhills
>
Building Department
>
Permits
>
2001
>
01-0272
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 2:42:47 PM
Creation date
10/3/2006 10:57:12 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
01-0272
Building Department - Name
BONUS DOLLAR STORES
Address
GALL BV
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. SECTION III - SCREW SPLINE - Fabrication, Assembly & Installation <br /> <br />The Screw-Spline System is a fabrication and erection method that perR'1its the pre-assembly of single units <br />in the shop or at the job site. These units are then erected by mating the male mullion half of one unit with the <br />female half of the unit already installed. <br /> <br /> 6 lsLJ 450-001 - Head <br /> ~ 450-004 - Glass Stop <br />- 7 450-003 - Horizontal <br />..c 450-002 - Filler <br />Cl <br />"Qj <br />:I: <br />Gl <br />E g{J <br />e 450-004 - Glass Stop <br />U. 7A 450-011 - Tube Horizontal <br /> P!J 450-004 - Glass Stop <br /> 8 450-003 - Sill <br /> 450-037 - Flashing <br /> 450-022 Glass Stops <br /> 9 450-502 - S/A T-Bar <br /> <br /> VERTICALS <br /> 1 2 2A 3 3A 4 4A 5 <br /> r <br /> ::Na..: <br /> :s.:>- <br /> ~1- <br /> L <br /> ~H"'4 <br /> TYP <br /> 450-001 450-540 450-501 450-019 450-501 450-019 450-033 <br /> 450-001 450-002 450-010 SI A Door DIA Door S/A Door DI A Door Insert <br /> Jamb Split Mullion Expansion Jamb Jamb Jamb Jamb In Door <br /> Mullion Jamb <br />. FIG. 1 <br />FABRICATION AND ASSEMBLY <br /> <br />. <br /> <br />HORIZONTALS <br /> <br /> 6 - 5 (Opp) <br /> 9 <br /> 7 <br /> . <br /> I <br />+- 1 2 2 8 3 4 <br /> I <br /> . <br /> <br />5 <br /> <br />. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />9A <br /> <br /> <br />450-022 Glass Stops <br />450-503 - D/A T-Bar <br /> <br /> <br /> <br /> <br />Step A: Measure the opening to determine length of vertical and horizontal framing members, Allow a <br />minimum of W' (6.4mm) clearance at the head, sill, and both jambs to facilitate installation and provide <br />space for caulking. If job conditions are uncertain, or masonry openings are irregular, allow extra <br />clearance to accommodate construction tolerance. 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.