Laserfiche WebLink
<br />SECTION III - SCREW SPLINE (Continued) <br /> <br />Step B: Cut vertical members to required length (Frame Height) (See FIG. 1). At desired horizontal locations <br />drill the proper holes in the verticals, as shown below. (See FIG. 2). <br /> <br />SCREW SPLINE PREPS <br />TO VERTICAL MEMBERS <br /> <br />450-001 SHOWN <br /> <br />rQOql <br /> <br />TOP OF MULLION <br />Ir~;) <br />- ~ I <br />-~": I <br />~~ I (r <br />L~ I II <br />I f7:t:\' II <br />L.==~v_ _..J. <br /> <br />L:..r -, <br /> <br /> <br />t 11IJi't-27/16"-11V3i' i <br />(26.2) (61.9) (26.2) <br />REF REF <br /> <br /> <br />TOP OF SILL <br /> <br /> <br />~~I \- <br />-NO " <br />~tf)~~1 11 <br />~--:i T"""~I r.-~I <br />~'T L -- -Or <br />- ~Q=- <br />I L'(-' <br />L -r.:-, <br />BOTTOM OF MULLION <br /> <br />6 <br /> <br />.228" DIA <br /> <br />HO~~; ~~,~E)Q'D. (~~~;) M-- 2V16"~ 9/,6" <br /> <br />REF (61.9 (14.3) <br />TOP OF REF <br />INTERMEDIATE <br />HORIZONTAL <br />~ <br />-N~ <br />~C;; <br />'I <br /> <br />TOP OF MULLION <br />r- <br /> <br />:::~;::::- <br />gi::a) <br /> <br />~L <br /> <br />RIGHT HAND SHOWN <br />LEFT HAND OPPOSITE <br /> <br />. <br /> <br />450-002 SHOWN <br /> <br />~ <br /> <br />o <br /> <br />o <br /> <br />. <br /> <br />- - (i) --= ==t <br /> <br />-J-- <br /> <br />'='<0 Ci) <br />~~ <br /> <br />A <br /> <br />9/,6" H-27/16"--H 9/16" <br />(14,3) (61.9) (14.3) <br />REF REF <br /> <br />:;:'lOCO <br />~:i <br /> <br />TOP OF SILL <br /> <br /> <br />BOTTOM OF MULLION <br /> <br />FIG. 2 <br /> <br />-0 <br /> <br /> <br />. <br /> <br />0- <br />I <br />