Laserfiche WebLink
<br />13. Install VCT type flooring and new cove base. <br />14. Room left broom clean <br /> <br />G. Exam Room 12 <br />1. Remove existing carpeting <br />2. Remove existing cabinets and fixtures <br />3. Patch drywall as requited <br />4. Paint entire room (one coat on existing painted surfaces, primer plus two coats on <br />new drywall) <br />5. Install 110 volt GFI receptacle at cabinet location <br />6. Install exam room cabinets. <br />7. Install exam room sink and fixture trim, matching existing hardware as close as <br />possible. <br />8. Install VCT type flooring and new cove base. <br />9. Room left broom clean <br /> <br />H. New corridor <br />1. Remove existing carpeting <br />2. Remove existing door fot use in Exam Room 10 <br />3. Remove wall section at eixisting hall <br />4. Penetrate separating wan between suites allowing for new hall access between suites <br />5. Modify "Specimen Lavatory" wall to accommodate S '-0" hall width (or as close as <br />handicap code will allow regarding clear space in front of water closet). <br />6. Install new partition to allow a minimum hall width of 5' -0" clear <br />a. Frame using me~al studs 16" O.C. <br />b. Wall to extend fltom floor TO existing drop ceiling. <br />c. Wall to be placed to allow existing light fixtures to remain in place <br />d. Wire for wall re~eptacles per minimum electrical code <br />e. Place sound-dea41ening insulation in wall f. Drywall both sides <br />7. Install emergency lighting per fire safety code <br />8. Install strip-type floresceht light in storage area <br />9. Patch drywall as required <br />10. Paint entire room and existing "Specimen Lavatory" (one coat on existing painted <br />surfaces, primer plus two coats on new drywall) <br />11. Install 2 sets 5'-0" x 6'-8" birch bifold doors for storage space access a. Doors to <br />be stained and finished to match existing doors <br />12. Install VCT type flooring and new cove base. <br />13. I 1. Room left broom clean <br /> <br />I. New Lab Area <br />1. Remove existing carpeting <br />2. Penetrate separating w~ll between suites allowing for access between suites <br />3. Utilize work space andl kitchen cabinetry and fixtures from Exam Rooms 10, <br />11, and 12 for use in lab 4rea as possible. Total cabinet allowance for lab area <br />is $1,800.00 including on~site labor <br />4. Cut concrete floor for ~ewer line tap and plumb for sink. <br />, <br /> <br />General Contractor <br /> <br />Site De elopment <br /> <br />Custom Homes <br /> <br />Steel Buildings <br /> <br />DesignlBuild <br /> <br />Off: (352)567~1349 <br /> <br />Fax: (352)567-7459 <br /> <br />Lic# cae 043354 <br />