My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
01-0152
Zephyrhills
>
Building Department
>
Permits
>
2001
>
01-0152
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 2:43:15 PM
Creation date
10/13/2006 9:00:31 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
01-0152
Building Department - Name
CAPSTONE CAPITAL
Address
GALL BV
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />5. Run hot and cold water line overhead. <br />6. Patch floor where cut. <br />7. Patch drywall as required <br />8. Paint entire room (one coat on existing painted surfaces, primer plus two <br />coats on new drywall) <br />9. Install up to three 110-volt GFI receptacles at cabinet location <br />10. Insta1l3-way switch for lab room lights allowing on/off from either access <br />11. Install VCT type flooring and new cove base. <br />12. Room left broom clean <br /> <br />J. New Public Bathroom <br />1. Remove existing carp~ting <br />2. Cut concrete floor for sewer line tap and plumb for water closet and sink. <br />3. Run hot and cold wateir line overhead. <br />4. Patch floor where cut. <br />5. Patch drywall as requited <br />6. Paint entire room (onel coat on existing painted <br />surfaces, primer plus twd coats on new drywall) <br />7. Install handicap-type water closet and wall hung sink <br />8. Install required <br />grab bars <br />9. Bath fixtures, trim and hardware per existing "Specimen Lavatory" as close as <br />possible. <br />10. Install VCT type flooring and new cove base. <br />11. Room left broom clean <br /> <br />K. Waitine: room area <br />1. Remove existing carp~ting <br />2. Remove South wall between suites allowing for access, leave header to <br />accommodate ceiling tilellocation <br />3. Patch drywall as requited <br />4. Place new 8' high divHier wall and ~ door with 7" wide top <br />a. wall will not extep.d to ceiling <br />b. door frame to be fuetal, knock-down type <br />c. door will be wood - finish to match existing doors as close as possible <br />d. door will only be [ower half - no upper portion <br />e. Owner or Ownet's representative to locate wall position. <br />f. Drywall finish <br />5. Paint entire room (one !coat on existing painted surfaces, primer plus two <br />coats on new drywall) <br />6. Install VCT type floorilng and new cove base. <br />7. Room left broom clean' <br /> <br />L. Hall Corridor <br />1. Remove existing carneting <br />2. Create new N/S hall dorridor between exam rooms F and E <br />3. Patch drywall as requfred <br />4. Paint entire hall (one ~oat on existing painted surfaces, primer plus two coats on <br />new drywall) : <br />5. Install two new lay-i9 type light fixtures - connect to existing corridor lighting <br />switch. <br /> <br />General Contractor <br /> <br />Site De elopment <br /> <br />Custom Homes <br /> <br />Steel Buildings <br /> <br />DesignlBuild <br /> <br />Off: (352)567~1349 <br /> <br />Fax: (352)567-7459 <br /> <br />Lic# CGC 043354 <br />
The URL can be used to link to this page
Your browser does not support the video tag.