My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
01-0615
Zephyrhills
>
Building Department
>
Permits
>
2001
>
01-0615
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 2:41:27 PM
Creation date
10/26/2006 10:35:16 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
01-0615
Building Department - Name
BOLENDER,JOHN
Address
39242 SOUTH AV
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />., <br /> <br />iO. Wire adequate c:IectricaHc lighting fixtures. to electric motor of exhaust unit. etc. <br /> <br />! I, DRAFT GAUGE SEtnNG (DRY TYPE BOOmS ONLY) <br />On d.1' type booths with arrestor exhaust only. calibrate the dn1ft gauge. With exhaust <br />unit still running, note the height of tile oil column (in inches of water) on the draft <br />gauge. Marie this point with a piece of tape to indicate the pressure with clean arrestor <br />pads. <br /> <br />Take pieces of cardboard and panially cover the arrestor pads in checker board fashion to <br />simulate clogged filters, Add sufficient pieces of cardboard until the surface velocity <br />drO?S to the minimwn allowable 100 feet per minute (air speed measured by a <br />velometer), Note the reading on the draft gauge a.,d marlc: with tape. This is the point <br />(pres:.-ure) at wbich to change the lIITC3tor pads. <br /> <br />Upon removal of all cardboard, the pressure should return to its original point on the <br />draft gauge 11laJ'k.ed with tape. <br /> <br />12. The paint spray booth is now ready for operation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.