Laserfiche WebLink
<br />----., <br /> <br />C'/t~A~?-El L 'S <br /> <br />SCHAPER <br /> <br />ROOFING, INC <br />11250 S. Hwy. 98, Dade City, Florida 33525 Phone: 352-567-8580 Fax 352-567-7073 <br />STATE CERTIFIED BUILDING AND ROOFING CONTRACTOR # CC-COS8134 CB-C059817 <br />Set'\l~FloriiU;v'K'F~tl~ & 13~S~1976 <br />Attn: Barbara Woodring <br />BJ's Country ~itchen <br />c-'~ <br />38451 Tony Rd. <br /> <br />Date: 6/19102 <br />1.;J ,..- '(' C:-'I - t;'r; 5 g h v~ <br />Phone: 813-779-9648 <br /> <br />Zephyrhills, FL 33540 '-.1 <br />J ')r- p... <br />'I -i ^"l..c/ ./ ~ '7 ~ <br />I .-r '-r . '7 . / <br />Parcel # ~ . L' ~ -<- 1 - ,I) 1 ^' <br /> <br />City/County <br /> <br />We hereby propose to furnish materials and labor necessary for the completion of: <br />Partial reroof or whole reroof <br />Duro Last roofing system <br /> <br />1. Barricade off work area as needed. <br />. <br /> <br />2. Remove loose debris from flat roof. <br /> <br />. <br /> <br />3. Remove d\sting flashings and boots as required. <br /> <br />4. Remove existing coping metal and lead drain sleeves. <br /> <br />5. Check substrate decking for water damage. Replacement of qecking will be done on a time and makrl.1 <br /> <br />basis at the rate of $36.00 dollars per man -hour plus materials marked up a 25% contractors fee. <br /> <br />6. Install fan fold insulation, mechanically attached per Duro Last specification. <br /> <br />7. Install Duro Last membrane for a IS-year material and labor warranty. <br /> <br />8. Install new Duro Last boots, custom curb and comers as required. <br /> <br />9. Install Duro Last two-way vents as required. <br /> <br />10. Inslall Duro Lasl whilc 4" fascia wilh COver as rC4uircd. <br /> <br />11. Disconnect and reconnect AlC units. Schaper Roofing will not be responsible for existing conditions ur <br /> <br />the wiring, freon lines, ductwork, electrical or the units due to the age of the units. <br /> <br />. ...,~. t~,:"_.,,Jp.J.t~U2uro Last drain sleeves with composite rings. <br />