My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
02-1326
Zephyrhills
>
Building Department
>
Permits
>
2002
>
02-1326
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 2:55:08 PM
Creation date
11/15/2006 9:16:40 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
02-1326
Building Department - Name
BJ COUNTRY KITCHEN
Address
38449 CR 54E
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />//. <br /> <br />SCHAPER <br /> <br />'ROOfING, INC <br />11250 S. Hwy. 98, Dade City, Florida 33525 Phone: 352-567-8580 Fax 352-567-7073 <br />STATE CERTIFIED BUILDING AND ROOFING CONTRACTOR # CC-C058134 CB-C059817 <br />Set"V~florr.da)K'f~H.~ 6- 13~S~1976 <br /> <br />" <br /> <br />Contractor warranty Upon completion of the work and payment of all monies owed. Contractor shall issue a <br />two (2) year warranty limited to leaks caused by any component install by the contractor. Duro Last shall issul: <br />a fifteen (15) warranty on workmanship and materials. <br /> <br />General Conditions All work shall be carefully supervised and completed by workmen skilled and <br />knowledgeable in the methods needed to produce high quality work. The job site shall be kept clean daily for <br />the duration of the job and the grounds shall be left clean of all roof related debris after completion. The yard <br />shall be swept with a magnet. Collection costs if any together with interest shall be added to the contract pricl: <br />ifpayment default occurs. Cancellation of the contract after the 72-hour grace period may incur a nominal fel:. <br />The contractor shall provide permit, Workman compensation, and general liability insurance. Carpentry, <br />authorized change orders and work, which are not covered under the scope of work outlined herein, shall be <br />performed on a time and materials basis unless otherwise agreed upon. <br /> <br /> <br />Duro L.A')t RoQjng system ~artial rerqpf . ~ ~ <br />f<..-t (......So~a. Cftrt/o'zf-t "d'- <br />Duro Last Roofi~ system whole flat roofMI",,~ <br /> <br />$ 26,951.00 <br /> <br />Terms: 50% down, balance upon completion. <br /> <br />Will/) (~ <br /> <br />Ward Leiter Schaper Construction & Roofing <br /> <br />si~oo:~d~ <br /> <br />Date: <br /> <br />C-;l~-a~ <br /> <br />Signed: <br /> <br />. <br /> <br />t> <br /> <br />.-." ..""....... <br /> <br />-, <br />
The URL can be used to link to this page
Your browser does not support the video tag.