Laserfiche WebLink
<br />..- <br /> <br />;: <br /> <br />t~.,,!-, <br /> <br />....' ---'-...,... :~;....- <br /> <br />G. Inspection and Warranty <br />After the installation is complete, a quality assurance specialist employed <br />by the system supplier shall inspect the visible details of the roofing <br />system for acceptability for warranty issuance, Any deficiencies shall be <br />corrected by the contractor and made ready for re-inspection within five (5) <br />working days. Upon acceptance, the warranty shall be promptly issued. <br /> <br />4.0 Contractors Requirements <br /> <br />The Contractor shall be responsible for the following items. <br />1. To supply labor, materials, and proper supervision to assure that the new <br />roof is installed in accordance with the system supplier's specifications. <br />2. Upon the City Council's award of bid, the successful bidder shall be given "i <br />a Notice of Commencement date, the owner requires that the roofing ,,~ J' <br />installation be completed within (14) working days from the date of ~:,.(:. ~ ")-r:./;o. <br />commencement. ~ '9" 9'" /A <br />3. To obtain a building permit from the City of Zephyrhills Building yf .... <br />Department (The permit fee will be waived), <br />4, To barricade off any work areas and to assure that the roofing system <br />installation does not interfere with normal business operations and to <br />assure the'safety of persons entering and exiting the building. <br />5. To cl~an up work areas and properly dispose of all debris in an approved <br />facility in accordance with all local, state, and federal regulations. <br />6. To provide the City's Parks & Facilities Manager with all written <br />documentation of the warranty provided by the roofing system supplier. <br />This warranty shall be a 15-year repair and or replacement warranty that <br />will cover the roofing system and accessories, including any inflation costs <br />of materials and labor. <br /> <br />4 <br />