My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
02-1340
Zephyrhills
>
Building Department
>
Permits
>
2002
>
02-1340
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 2:55:04 PM
Creation date
11/15/2006 10:16:54 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
02-1340
Building Department - Name
CITY OF Z-HILLS
Address
39421 SOUTH AV
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />... r---'-- <br /> <br /> <br />such work shall be executed under the applicable conditions. of the <br />Contract Documents. If any Change Order causes an increase or <br />decrease in the Contract Price or an extension or shortening of the <br />Contract Time, an equitable adjustment will be made. " <br /> <br />The RPR may authorize changes or alterations in the work not involving <br />extra cost and not inconsistent with the overall intent of the Contract <br />Documents. These may be accomplished by a Field Order. If the <br />Contractor believes that any minor change or alteration authorized by <br />the RPR entitled him to an increase in the Contract Price, he may make a <br />claim in writing. <br /> <br />The Contractor shall not start work on any alteration requiring an increase <br />or decrease in price or extension of time until a Change Order setting <br />forth the adjustments is executed by the City. <br /> <br />It is the Contractor's responsibility to notify his Surety of any changes <br />affecting the general scope of the work or change in the Contract Price <br />and the amount of the applicable Bonds shall be adjusted accordingly. <br />The Contractor shall furnish proof of such adjustment to the City. <br /> <br />Change of Contract Time: The Contract Time may only be changed by a <br />Change Order. Any claim for an extension in the Contract Time, shall be <br />in writing delivered to the City within five days of the occurrence of the <br />event giving rise to the claim. All claims for adjustment in the Contract <br />Time shall be determined by the Engineer if the City and the Contractor <br />cannot otherwise agree. Any change in the Contract Time resulting from <br />any such claim shall be incorporated in a Change Order. <br /> <br />The Contract Time will be extended in an amount equal to time lost due <br />to delays beyond the control of the Contractor if he makes a claim <br />therefore as prOVided for. Such delays shall include, but not be restricted <br />to, acts or neglect by any separate Contractor employed by the City, <br />fires, floods, labor. disputes, epidemics, abnormal weather conditions, or <br />acts of God. . <br /> <br />All time limits stated in the Contract Docume/')ts are of the essence of the <br />Agreement. <br /> <br />Where delays are not justified and actual damages are impossible of <br />agreed determination, and when so required by a statement in the <br />section "Special Conditions", the Contractor and his Sureties shall be <br />liable for and shall pay to the City the sum stated in "Special Conditions", <br /> <br />19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.