My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
03-2122
Zephyrhills
>
Building Department
>
Permits
>
2003
>
03-2122
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 3:08:20 PM
Creation date
12/20/2006 9:07:41 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
03-2122
Building Department - Name
VASQUEZ,MANUEL
Address
5740 7TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />SCHAPER ROOFING, INC. <br /> <br />8949 Gall Blvd. Zephyrhills, FL 33541 <br />PH: (352) 567-8580 & (813) 782-0920 Fax: (813) 715-4762 <br />STATE CERTIFIED BUILDING AND ROOFING CONTRACTOR #CB-C059817 and #CC-C058134 <br />Serving Florida's Finest Homes & Businesses since 1976 <br /> <br />Name Corinne Vasquez ..f-. )'0.0.5 t, ok rVc . <br />/ <br /> <br />Date 5/16/03 <br /> <br />Address 5740 ih St. <br /> <br />Phone 424-0497 588-4816 <br /> <br />Zephvrhills, FL 33541 <br /> <br />City/County_City <br /> <br />Parcel # <br /> <br />We hereby propose to furnish materials and labor necessary for the completion of: <br /> <br />Metal Reroof <br /> <br />1. For the shingled portions of the bus., remove old roofing materials to dry-in, taking precautions to protect the <br />building and the landscaping. Groom the deck and reset existing decking nails. <br />2. Replace bad wood other than herein agreed for at _$36.00 _ per man-hour plus materials marked up a 25% <br />contractor's fee. <br /> <br />3. Install one <br /> <br />layer(s) of ASTM 30 lb. Asphalt shingle underlayment. <br /> <br />4. Cut and remove three sides of the duro last drip edge so metal can be installed properly. <br />5. Chalk lines shall be struck to assure proper metal exposure. <br />6. Install_20 _ year _S Style metal Berridge metal roof system. <br />- <br />Manufacturer:_Berridge Color:_Choice ! ell-I( f) C (}i:!f) <br />7. Install l' wide strip of duro last onto membrane and over shingles. <br />8. Install 4" Fascia with metal cover tying duro last roof into shingle roof. <br />9. Caulk fascia as required by duro last specifications. <br /> <br />13/' (t' / '<V7 <br /> <br />If!- Altc '" 5" <br />f7 0 OO,/( I ( ( r; <br />,/ -1'---.(; <br />P,;/ r) J (L- 7_,5 / <br /> <br />)19 ,v <br /> <br />Server 0/ My Documents/ Sales Team and Production Contracts/ Shingle Reroof <br />
The URL can be used to link to this page
Your browser does not support the video tag.