My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
03-2122
Zephyrhills
>
Building Department
>
Permits
>
2003
>
03-2122
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 3:08:20 PM
Creation date
12/20/2006 9:07:41 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
03-2122
Building Department - Name
VASQUEZ,MANUEL
Address
5740 7TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Schaper Roofin2. Commitment to Qualitv <br /> <br />-All work shall be carefully supervised and completed by workmen skilled and knowledgeable in methods needed to <br />produce high quality work. <br />-The job site shall be kept clean daily for the duration of the job and the grounds shall be left clean of all roof related <br />debris after completion. <br />-The yard shall be swept with a magnet. <br />-The contractor shall provide permit, workman compensation, and general liability insurance. <br />-Carpentry, authorized change orders and work, which are not covered under the scope of work outlined herein, shall be <br />performed on a time and material basis unless otherwise agreed upon. <br /> <br />MANUFACTURER & CONTRACTOR WARRANTY (8) <br />Upon completion of the work and payment of all monies owed, Contractor shall issue: <br />1. A_5_ year warranty for workmanship limited to leaks caused by any component install by the contractor. <br />2. Shingle manufacturer shall provide a _30_ year limited warranty. <br /> <br />***************Contract Pricin ************** <br /> <br />Visible T & M Allowance <br /> <br />$ 1,000.00 allowance_ <br />$ 11,627.00 <br />$ <br />$ <br />CONTRACT TOTAL: <br /> <br />Metal Reroof as described herein <br /> <br />Modifications <br /> <br /> <br />Price valid for thi (30) da s. <br />Collection costs if any, together with interest shall be added to the contract price if payment default occurs. Cancellation <br />of the contract after the 72-hour grace period shall incur a nominal fee. <br /> <br />$ 12.627.00 <br /> <br />I~Jl1fl(} ~_~( <br />Schaper Roofing, Inc. epresentatIve <br />I accept the above price and terms; you are authorized to begin work. <br /> <br />Date -:J/ 20) oy <br /> <br />Signed ~PZ7? <br /> <br />Date <br /> <br />\5;;({).63 <br /> <br />Signed <br /> <br />Server G/ My Documents/ Sales Team and Production Contracts/ Shingle Reroof <br />
The URL can be used to link to this page
Your browser does not support the video tag.