Laserfiche WebLink
<br />IIUNTINGTON ROOFING, INC. <br />3375 Highway 98 South <br />Building B Suite 2 <br />Lakeland, Florida 33803-8340 <br />(863) 667-1275 <br />L.G.# GGG 056661 <br /> <br />January 15, 2004 <br /> <br />SYBRA, Inc. <br />10937 N. g6th. Street <br />Temple Terrace, FL 33617 <br />Attn: Melissa Oisipio <br /> <br />RE: ARBY'S #5906, 7446 GALL BLVD., ZEPHYRHILLS, FL <br />INSTALLATION OF NEW EPDM ROOFING SYSTEM, OVER <br />THE EXISTING TROGAL ROOF SYSTEM <br /> <br />Dear Ms. Oisipio: <br /> <br />Thank you for allowing us the opportunity to be of service <br />to you. We greatly appreciate your business. We have <br />examined the roof on the afore mentioned building, as <br />requested, and submit the following proposal for your <br />consideration. <br /> <br />~UNTINGTON ROOFING, INC. WILL FURNISH ALL LABOR, AND MATERIALS TO <br />~OMPLETE THE FOLLOWING: <br /> <br />1. Furnish, and install 1/2", HO recovery board roofing <br />insulation as manufactured by Firestone Building Products, <br />I n c .. Ins u 1 at ion w ill b_e- me c h ani c all y at t a c h e d 0 v e r the <br />existing Trocal roof system, using approved fasteners, and <br />insulation plates, as per Firestone Building Products, Inc. <br />specifications, and recommendations. <br /> <br />2. Furnish, and install Firestone's rubbergard .045 EPOM, non <br />reinforced roofing membrane (black), using Firestone's <br />bonding adhesive (BA-2004) to adhere the roofing membrane <br />to the newly installed HO hard board insulation. Install- <br />ation of the membrane will be as per Firestone's specifi- <br />cations, and recommendations for the fully adhered roof <br />system. <br /> <br />3. Furnish, and install 3/8" COX plywood (4' x 8' sheets) to <br />all high wall area's over the existing Tr-ocal coated metal <br />panels. The new COX plywood panels will be mechanically <br />attached with an approved self drilling fastener, and will <br />be attached so as to secure to the existing wall studs. The <br />