Laserfiche WebLink
<br />plywood is needed so that the new EPDM flashing mem- <br />brane materials will have an approved susbtraite to be ad- <br />hered to. <br /> <br />4. Furnish, and install new Firestone rubbergard membrane <br />flashing's, in accordance to Firestone's specifications, <br />and recommendations, at all of the following locations. <br /> <br />A. Parapet, and high wall area's. <br />8. All curbed penetrations. <br />C. All roof drain, and scupper area's. <br />D. All roof vent pipes. <br /> <br />5. Furnish, and install the following sheet metal flashing's <br />in accordance with SMACNA (Sheet Metal, and Air Condi- <br />tioning, Contractors National Association) architectural <br />sheet metal manual, and specifications. <br /> <br />A. Skirt flashing's, to be installed under back flange of <br />existing coping cap, and unit tops. To be fabricated <br />from 24 gauge galvanized sheet metal. <br /> <br />8. Pitch pans at unit leg locations. To be manufactured <br />from 24 gauge galvanized sheet metal. <br /> <br />BASE BID $20,950.00 TAX INCLUDED <br /> <br />QPTION #1 <br />I <br />! <br /> <br />Huntington Roofing, Inc., will warrant the newly installed <br />Firestone membrane roof system for two years from the date <br />of completion for workmanshiP; however a full roofing system <br />warranty for 10 years, covered by Firestone Building Products, <br />of which would give you the security of a manufactures warr- <br />anty is "included in the above cost. <br /> <br />~pTES :_ <br /> <br />1. The existing Trocal roofing system, and its flashing's <br />along with the 2 inch Isosyanurate insulation, will remain <br />in place, and the new EPOM roofing system will be installed <br />over the Trocal roof system. <br /> <br />2. There is electrical box's, and conduit lines that run along <br />the high north back wall that wi 11 have to be loosened to <br />install the new COX plywood overlay on the walls, then re- <br />installed to the new plYWOOd after the walls are flashed. <br />We do not assume any responsibility for the box's, or the <br />conduit, or any disruption of electric to the building <br />caused by loosening or reconnecting these to the wall <br />