My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
04-2759
Zephyrhills
>
Building Department
>
Permits
>
2004
>
04-2759
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 3:25:55 PM
Creation date
1/19/2007 10:09:14 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
04-2759
Building Department - Name
ARBY'S
Address
7446 GALL BV
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />area's. I recommend that an electrical contractor, or <br />Arby's corporate maintenance personnel loosen, and re- <br />attach these electrical items. <br /> <br />3. The existing satellite system will need to be moved during <br />the re-roof process. We will attempt to locate it in the <br />same position as previous, but we assume no responsibility <br />for damage, or it's location. <br /> <br />4. This proposal does not include repairs to or replacement of <br />deteriorated sheathing, insulation, metal roof decking or <br />wood work, and we do not assume responsibility for any <br />structural, or interior damages caused by existing cond- <br />itions. <br /> <br />5. All coping cap will remain in place, and will be reused. <br /> <br />6. All debris incurred during re-roofing will be removed, and <br />property will be left in a clean, and orderly condition. <br /> <br />7. All work will be done in a timely, and safe manor. It may <br />be necessary to use safety markers to block off area's so <br />as to keep all foot traffic away from the overhead work <br />area. We wi 11 do our best to not interrupt the dai ly <br />business of this facility. However in order to complete <br />some area's of work close to foot traffic, and to keep all <br />safe, it may be necessary to keep all non construction <br />roofing personnel out of an area. <br /> <br />We carry workman's compensation, property damage, and public <br />liability insurance to protect the owner during the course of the <br />work. Once work is started, it will be pursued to completion as <br />weather wi 11 allow during normal work days. If there are any <br />questions or points we have fai~ed to cover, or make clear, or to <br />receive your order, we are as near as your phone and welcome your <br />call, and the opportunity to serve your Roofing needs. <br /> <br />[S~relY, <br /> <br />. Z~;.~k:1-,~ <br /> <br />V Operat-,ons Manager/Huntington Roofing, Inc. <br /> <br />LG/psb <br />
The URL can be used to link to this page
Your browser does not support the video tag.