My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
04-2825
Zephyrhills
>
Building Department
>
Permits
>
2004
>
04-2825
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 3:25:37 PM
Creation date
1/24/2007 11:38:47 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Plan/Print
Permit #
04-2825
Building Department - Name
LAURIE DOYAL TRUSTEE
Address
5231 1ST ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />BRIGHT HOUSE NETWORKS <br />GENERAL RIGHT OF WAY PERMIT <br /> <br />EXHIBIT" A " <br /> <br />Bright house Networks daily activities that do not require a specific right of way utilization permit <br />when working within the bmmdaries of Pasco County right of way <br /> <br />NFW Customer Service <br /> <br />1. Installation of service drops from serving location. <br />2. Installation of new aerial distribution cable from existing poles. <br />3, Installation of 8 second aerial distribution cable from existing poles. <br />4, Extension of existing aerial distribution cable from existing poles. <br />5. Installation of anew bW'ied distribution cable that does not cross or begin in the pavcement. <br />6. Extension of an existing buried distribution cable that does not cross or begin in the pavement. <br />7, Installation of two way four inch conduit system that does not cross or begin in the pavement, <br />8" Extension of a two way four inch conduit systam that does not cross or begin in the pavement. <br />9. Installation of a new pole line. <br />,,) 10. Extension 0( ~ pole li.nc providing it does not encroach into an Wlderground utility area. <br />11. Adding of new equiptment to existing cable. <br />12. Pulling in new underground feeder cables in an existing permitted manhole and conduit system. <br />13. Digging of B splice hole to splice 8 new cable or changing equiptrnent. <br />14. Diging of a splice hole for cable acceptance testing for quality. <br />15. Digging of a splice hole to change the size of a cable leg for new service. <br /> <br />Maintenance of imtku! CATV Facilities <br /> <br />1. Replacement of existing service drops, <br />2. Replacement! repair of an existing aerial cable providing other aerial utility service still exist. <br />3. Replacement of existing poles providing other aerial utility service still exist <br />4. Replac.-~ repair of existing equiptment. <br />5. Rep1acemont! repair of an existing underground feeder cable in an existing pemritted manhole <br />and conduit S}1Item. <br />6. Pumpina water out of a manhole to maintain underground cables in conduit system. <br />7. Diging of splice holes to locate and repair damaged cables. <br />8. Digging of 8 splice hole to change the size of the cable, <br />9. Disging of a splice hole to add a sidA? leg off feeder cable. <br />10. Digging of a hole to repair braken. conduits. <br />11. Diging of 81plice hole for cable acceptance testing for quality, <br />1 Z. Diging of 8 splice hole to repair damaged cable. <br />13. Digging ofa hole to verify the location of buried facilities. <br />14. Removal of facilities no longer needed for service. <br />1 S. Tree trimming to clear aerial facilities. <br />16. Adjust aerial facilities to accommodate other users of pole line and! or to meet National Elcctri <br />Safety Code. <br />
The URL can be used to link to this page
Your browser does not support the video tag.