Laserfiche WebLink
<br />BRIGHT HOUSE NETWORKS <br />GENERAL RIGID OF WAY PERMIT <br /> <br />EXIllBIT " B " <br /> <br />A GENERAL RIGH OF WAY PERMIT (GRP) - is given for certain routine repetitive work not requiring <br />a specific permit defined on Exhibit" A ,. that is 5 feet or greater from back of curb (BOC) or edge of <br />pavement (EP). <br /> <br />No roadway will be open cut or directional drilled with this pennil. <br /> <br />Upon completion of work the Pasco County Inspector shall be notified for a final inspection of the <br />project. <br /> <br />9 <br />~.. <br /> <br />Best Management PractWes (BMP) will be observed at all times. <br /> <br />NotitY Sunahirle State One Call of Florida at 1.800-432-4770 not less than 48 hours or more than <br />5 days prior to construction,and all other requirements of Florida Statute 556 will be observed at <br />all times. <br /> <br />MAINTENANCE OF TRAFFIC <br /> <br />· All activities in accordance with this agreement will require conformance to the "Muwal of <br />Traffic Control and Safe Practices for Street and Highway Construcion. Maintenance and <br />Utility Operations," (Chapter 316, Florida Statues) <br /> <br />· Pedestrian, bicycle and handicap traffic must be safely maintained and must not be redirected <br />into the roadway or into ditches. Use of sidewalks may not be impaired or closed for greater <br />that 60 minutes. When a sidewalk is to be removed means of rerouting pedestrians. biDycliats <br />and handicapped people must be constructed prior to sidewalk removal per Florida <br />Department of Transportation (FOOT), Manual on Uniform Traffic Control Revises MUTCD <br />and American Disabilities Act (ADA), <br /> <br />· No street shall be closed without the prior written permi.ision of Pasco County Inspector. At <br />least 2 normal working days (Monday thm Friday) advance notice is required All <br />maintenance of traffic plans are to be sulmitted to the Pasco Cowrty Inspector for approval <br />prior to commencement of CC81StructiOn. Appropriate wor}c zone safety is to be followecl at all <br />times. <br /> <br />· All construction activities shall include traffic control through the work zone in aooordance <br />with FOOT" Roadway and Traffic Design Standards" Indexes 600 Series titled .. Traffig <br />Control Through Work Zones." <br /> <br />Where it is discovered that a site specific permit will be required, i.e., during excavation existing fiwilities <br />become less that 5 feet from BOCIEP. <br /> <br />1) The Construction Supervisor will notify the Bright house Networks Engineer that a project <br />Cannot be canp1eted under the GRP. <br />