Laserfiche WebLink
<br />EXlDBIT .. B .. continued <br /> <br />2) The Bright house Networks Engineer will notifY the Pasco County Inspector of the situation <br />and schedule a field meeting. (Every effort will be made to arrange the field meetmg within <br />a time frame that will not require the Construction Crew to leave the site and reshedule the <br />work.) <br /> <br />3) The Bright house Networks Engineer will be responsible for notification all appropriate <br />personnel of the time and location of the field meeting, <br /> <br />4) A mutual understanding of the scope of work required to complete the project will be achieved <br />at the field meeting, <br /> <br />5}At the Pasco Cowrty Inspector's discretion, a verbal approval of the work may be issued <br />allowing work to resume. <br /> <br />,i..<' <br />;';1, <br /> <br />6) The Brisht house Networks Engineer shall apply for a .ite specific Peunit: inclusive of all <br />details as agreed upon at the field meeting. (If a Verba14pproval was granted. the site specific <br />shall be submitted as an" After -the-Fact" application,) <br /> <br />7) Uponcomp1etion of the work, the Pasco COWlty Inspector shall be notified for a final <br />inspection of the project <br /> <br />---"RIGHT OF WAY RESTORATION <br /> <br />· All disturbed areas in the right of way will be sodded wUess oth.et:wise directed by Pasco <br />County Inspector. Sod must be maintained until it roots, a minimum water of2 weeks. <br /> <br />· Vegetation., other than sod, will be restored to its pre-construcion condition. <br /> <br />· Prior to disturbing sprinkler systems, plants and mailboxes that may be disturbed during <br />construction, notifY property owners. Replace those items that are damaged by pennittee. <br /> <br />· The permittee shall be responsible for handling all complaints regarding the construction <br />project. <br />