My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
04-2828
Zephyrhills
>
Building Department
>
Permits
>
2004
>
04-2828
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 3:25:35 PM
Creation date
1/24/2007 11:43:18 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Plan/Print
Permit #
04-2828
Building Department - Name
HAVERLOCK,BRIAN
Address
38635 SOUTH AV
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />BRIGHT HOUSE NETWORKS <br />GENERAL RIGHT OF WAY PERMIT <br /> <br />EXHIBIT" A " <br /> <br />Bright house Networks daily activities that do not require a specific right of way utilization pennit <br />when working within the boundaries of Pasco County right of way <br /> <br />New Customer Service <br />I <br /> <br />1. Installation of service drops from serving location. <br />2, Installation of new aerial distribution cable from existing poles. <br />3. Installation of a second aerial distribution cable from existing poles. <br />4. Extension of existing aerial distribution cable from existing poles. <br />5. Installation of anew buried distribution cable that does not cross or begin in the pavcement <br />6. Extension of an existing buried distribution cable that does not cross or begin in the pavement. <br />7. fustallation of two way four inch conduit system that does not cross or begin in the pavement. <br />8. Extension of a two way four inch conduit systarn that does not cross or begin in the pavement. <br />9. Installation of a new pole line. <br />10. Extension of exi$ting pole line providing it does not encroach into an underground utility area. <br />11. Adding of new equiptment to existing cable. <br />12. Pulling in new underground feeder cables in an existing permitted manhole and conduit system. <br />13, Digging of a splice hole to splice a new cable or changing equiptrnent. <br />14. Digging of a splice hole for cable acceptance testing for quality. <br />15. Digging of a splice hole to change the size of a cable leg for new service. <br /> <br />Afaintenance of Existin& CATV FacHities <br /> <br />1. Replacement of existing service drops, <br />2. Rcplacemontl repair of an existing aerial cable providing other aerial utility service still exist. <br />3. Replacement of existing poles providing other aerial utility service still exist <br />4. Replacemcntl repair of existing equiptment. <br />5, ReplaccmentJ repair of an existing underground feeder cable in an exi3ting permitted manhole <br />and conduit s)'Jtcm. <br />6. Pumping water out of a manhole to maintain undergroWld cables in conduit system. <br />7. Digging of splice holes to locate and repair damaged cables. <br />8. Digging of a splice hole to change the size of the cable, <br />9. Digging of a splice hole to add a side leg off feeder cable. <br />1 Q. Di.agi.ng of a hole to repair broken conduits. <br />11. Digging of a splice hole for cable acceptance testing for quality, <br />121. Diging of 8 splice hole to repair damaged cable. <br />13L Digging of a hole to verify the location of buried facilities, <br />14l. Removal of facilities no longer needed for service. <br />15~ Tree trimming to clear aerial facilities. <br />16~ Adjust aerial facilities to accommodate other users of pole line Wldl or to meet National Electri <br />Safety Code. <br />
The URL can be used to link to this page
Your browser does not support the video tag.