Laserfiche WebLink
<br />BRIGHT HOUSE NETWORKS <br />GENERAL RIGHT OF WAY PERMIT <br /> <br />EXlDBIT " B " <br /> <br />A GENERAL RIGH OF WAY PERMIT (GRP) - is given for certain routine repetitive work not requiring <br />a specific permit defined on Exhibit" A ,. that is 5 feet or greater from back: of curb (BOC) or edge of <br />pavement (EP). <br /> <br />No roadway will be open cut or directional drilled with this pennit. <br /> <br />Upon completion of work the Pasco County Inspector shall be notified tor a fmal inspection of the <br />project. <br /> <br />Best Management PractiCes (BMP) will be observed at all times. <br /> <br />NotifY Sunshine StaY One Call of Florida at 1-800-432-4770 not less than 48 hours or more than <br />5 days prior to construction,and all other requirements of Florida Statute 556 will be observed at <br />all times. <br /> <br />MAINTENANCE OF TRAFFIC <br /> <br />· All activities in accordance with this agreement will require confonnance to the "Marwal of <br />Traffic Control and Safe Praotices for Street and Highway Construcion, Maintenance and <br />Utility Operations." (Chapter 316. Florida Statues) <br /> <br />· Pedestrian. bicycle and handicap traffic must be safely maintained and nwst not be redirected <br />into the roadway or into ditches. Use of sidewalks may not be impaired or closed for greater <br />that 60 minutes. When a sidewalk is to be removed means of rerouting pedestrians. bioycliats <br />and handicapped people must be constructed prior to sidewalk removal per Florida <br />Department ofTranaportation (FDOT). Manual on Uniform Traffic Control Revises MUTCD <br />and American Disabilities Act (ADA). <br /> <br />· No street shall be olosed without the prior written peIIllission of Pasco County Inspector. At <br />least 2 normal working days (Monday thru Friday) advance notice is required. All <br />maintenance of traffic plans are to be sulmitted to the Pasco County Inspector for approval <br />prior to commencement of construction. Appropriate worJc zone safety is to be follow~ at all <br />times. <br /> <br />· All construction activities shall include traffic control through the work zone in accot'dance <br />with FOOT" Roadway and Traffic Design Standards" Indexes 600 Series titled" Traffio <br />Control Through Work Zones." <br /> <br />Where it is discovered that a site specific permit will be required, i.e.. during excavation existing facilities <br />become less that 5 feet from BOCIEP. <br /> <br />1) The Construction S11peIVisor will notifY the Bright house Networks Engineer that a project <br />Cannot be ccmpleted under the GRP. <br />