Laserfiche WebLink
<br />EXmBIT .. B .. col1Uaued <br /> <br />2) The Bright house Networks Engineer will notitY the Pasco County Inspector of the situation <br />and schedule a field meeting. (Every effort will be made to arrange the field meeting within <br />a time frame that will not require the Construction Crew to leave the site and reshedule the <br />work.) <br /> <br />3) The Bright house Networks Engineer will be responsible for notification all appropriate <br />personnel of the time and location of the field meeting. <br /> <br />4) A mutual understanding of the scope of work required to complete the project will be achieved <br />at the field meeting. <br /> <br />5}At the Pasco COWlty Inspector's discretion, a verbal approval of the work may be issued <br />allowing work to reswne. <br /> <br />lL,.!~:, <br />_.. <br /> <br />6) The Bright house Networks Engineer shall apply for a lite specific Pemait inclusive of all <br />details as agreed upon at the field meeting. (If a Verbal ~proval was granted. the site apeoi1ic <br />shall be submitted as an .. After -the-Fact" application.) <br /> <br />7) Upon completion of the work, the Pasco COWlty Inspector sha.11 be notified for a final <br />inspection of the project <br /> <br />----RIGHT OF WAY RESTORATION <br /> <br />· All disturbed areas in the right of way will be sodded tmless otherwise directed by Pasco <br />COWlty Inspector. Sod must be maintained Wltil it roots, a minirnwn water of2 weeks. <br /> <br />· Vegetation. other than sod, will be restored to its pre-construcion condition, <br /> <br />· Prior to disturbing sprinkler systems. plants and mailboxes that may be disturbed dwing <br />construction, notify property owners, Replace those items that are damaged bypemrittee. <br /> <br />· The pennittee shall be responsible for handling all complaints regarding the constnwtion <br />project. <br />