Laserfiche WebLink
<br /> <br />FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION <br />CHAPTER 4 - Commercial Building Compliance Methods <br /> <br />'''''tHe. OVT <br /> <br />Zone: <br />Building Classification: <br />Building Permit No,: <br />Permitting Office; <br />Jurisdiction No.: <br /> <br /> <br />CENTRAL <br />Climate Zone 4 6 <br /> <br /> BUILDING INFORMATION <br />WALLS ROOF/CEILING FLOORS DOORS GLASS <br />TYPE U AREA TYPE U AREA TYPE U AREA TYPE U AREA TYPE U AREA <br />Concrete fCBm .04 ~flf} Under Attic Slab-on-orade {Or.n Wood Sinnle wall ., '7^er <br />Wood frame r Sinale Assemblv' I.a; IQI.I\ Raised Wood Metal Lt;[ 'Z./ Double, wall <br />Metal frame .IX "7/,}^ Other: Raised Concrete Insulated Sino Ie roof <br />Insulation R-value I ~?./l q Insulation R-value ~ Insulation R-value jif Other Double, roof <br /> <br /> SYSTEMS INFORMATION <br /> AIR CONDIT10NER HEATING SYSTEM HOT WATER <br />TYPE EFFICIENCY TONS TYPE EFFICIENCY BTUlH TYPE <br />Unitary & Heat Pump .L.!L SEER ~ Central & Heat Pump Electric <br /><65,000 Btu/h <65,000 Btu/h _ HSPF - Resistance 0 <br />2:65.000 Btu/h _EER _'PLV - 2:65.000 Btu/h _COP - Dedicated Heat Pump 0 <br />Water cooled _EER _'PLV - Water cooled _COP - Gas <br />Evaporabvely cooled _'EER - Evaporatively cooled _COP IBM Natural 0 <br />PTAC _EER - Electric Resistance _COP LPG 0 <br />Chiller _COP _'PLV - Gas/Oil (circle one) HRU 0 <br />Gas heat pump _COP - <225,000/300,000 Btu/h _ AFUE - Other: Ni:JNf! 0 <br />Other: >225.000/300,000 Btu/h E, <br />LIGHTING Total Lighting Wattage '3'OID I. q T SIZING CALCULATION [ DUCTS R-value f- <br /> - l'l"~ - 0 Location A./JU. C'tr <br />Total Conditioned Floor Area Wattslsq, II, Attached <br /> <br /> PRESCRIPTIVE MEASURES (Must be met or exceeded by all buildings.) <br />Components Section Reaulrements Check <br />Operations Manual 102,1 Operations manual will be orovided to owner, ./ <br />Windows & Doors 406,1 Maximum: ,3 cfm Der so.!t of window area; Maximum: 1.2 cfm Der so,ft of door area, 17 <br />Joints/Cracks 406,1 To be caulked, casketed, weatherstripoed or otherwise sealed, ,J <br />Drooped Ceilino Cavity 406,1 Vented: seal and insulate ceilino (no T-bar ceilinos). Unvented, no ceilino air barrier: seal and insulate roof and side walls, II <br />Reheat 407.1 Electric resistance reheat prohibited, t/ <br />Ventilation . 409,1 Supplied with readily accessible switch for shut-off and/or volume reduction when ventilation is not required, 1/ <br />HVAC Efficiency 407,1,408.1 Minimum efficiencies - Heating: Tables 4-7, 4.8, 4-9, Cooling: Tables 4.3. 4-4, 4-5, 4-6, i7 <br />HVAC Controls 407,1 Separate readily accessible manual or automatic thermostat for each system, ,7 <br />HV AC Ducts 410,1 Air ducts. fittings, mechanical equipment and plenum chambers shall be mechanically attached. sealed, insulated <br /> and installed in accordance with the criteria of section 410,1, V- <br />Balancing 410.1 HVAC distribution system(s) tested and balanced, ./ <br />Piping Insulation 411.1 In accordance with Table 4- 1 1 , <br />Water Heaters 412,,1 Automatic electric storage water heaters $120 gallons and gas & oil tired storage water heaters $75,000 Btu/h shall meet <br /> performance requirements in Table 4.12, Electric> 120 gallons: standby loss $,30+27NT. Gas >75,000, Oil >105,000: E, .78, <br /> Standby loss < 1.30+1 14IVT, Gas, Oil >155,000: E,,78, Standby loss < 1.30+95/VT, <br />Swimming Pools 412,1 Spas & heated pOOls must have covers. Non-commercial pOOls must have pump timer. Gas spa & pool heaters must <br />& Spas have a minimum thermal efficiency of 78%, <br />Hot Water Pipe 412,1 Piping heat loss is limited to the levels in Table 4-11 for circulating systems and the first 8' of pipe from a storage <br />Insuiation tank, <br />Water Fixtures 412,1 Shower head water flow restricted to maximum of 2,5 gpm at 80 psi. Toilets meet 42CFR 6295(k), Public lavatory fixture <br /> maximum flow of .5 gpm; or if selt.closing valve, ,,25 gallon circulating, ,5 gallon non-circulating, v' <br />Lighting 415,1 Ballasll; shall have Power Factors no less than ,90. V <br /> <br /> <br />Compliance with Chapter 4 was demonstrated by a Prescriptive Measures methodology: <br /> <br />Detached Buildings <200 sq,tt, 0 Convenience stores <5,000 sq,tt <br />Skyboxeslsports stadiums 0 Restaurants <5,000 sq,tt <br />Tratfic safety control towers 0 Retail stores <5,000 sq,lI, <br /> <br /> <br /> <br />o <br />i <br /> <br />Office buildings <5,000 sq,lI, <br />School buildings <5,000 sq.tt, <br />Storage buildings <5,000 sq,tt, <br /> <br />o <br />o <br />o <br /> <br />s covered by the calculation are in compliance with lhe <br /> <br />-'--.._U'u,uu DATE:U.tt-01 <br />ce with the Florida Energy Code. <br /> <br />Review of plans and specifications covered by this calculation indicates compliance wilh <br />the Florida Energy Code. Bet e conslruCli IS completed, this bUilding will be inspected <br />torcompilance ,n accordanc 'th Ii 5 3908, FS" <br /> <br />BUILDING OFFICIAL: <br /> <br />OWNER AGENT: <br /> <br />DATE <br /> <br />DATE: <br /> <br />..1 <br /> <br /> <br />FLORIDA BUilDING CODE - BUilDING <br /> <br />13.167 <br />