Laserfiche WebLink
<br />01-40030.06 <br />Page 3 of6 <br /> <br />Test Specimen Description: (Continued) <br /> <br />--- <br /> <br />Frame Construction: All frame members were constructed of extruded vinyl with mitered <br />and welded comers. End caps were utilized on the ends of the meeting rail and secured with <br />two 1-1/4" screws per cap. Meeting rail was then secured to the frame utilizing two 1-114" <br />screws. The units were mulled together utilizing a PVC snap-in mullion clip. <br /> <br />Sash Construction: All sash members were constructed of extruded vinyl with mitered and <br />welded comers. <br /> <br />Screen Construction: The screen frame was constructed from roll-formed aluminum <br />members with keyed comers. The fiberglass mesh was secured with a flexible spline. <br /> <br /> Hardware: <br /> Description Quantitv Location <br /> Metal sweep lock with keeper 4 7" from stiles on interior meeting rail <br /> Spring-loaded coil balance 4 One per jamb <br /> Metal tilt latch 4 Each end top rail <br />"- Metal tilt latch pin 4 Each end bottom rail <br /> Screen spring-loaded retainer pin 4 6-3/4" from rails on stile <br /> Drainage: <br /> Description Quantitv Location <br /> 3/16" wide by 1/2" long 8 1 " from stiles under glazing <br /> <br />1/16" wide by 1/2" long 16 Two ~-U*~irf>mM;tit~, bottom rail <br />BUIL01N :wED FOR <br />I II' Th . . . R~\!.IE T J\ri.Tr'~ <br />?,sta atI?n: e test s~ecImens were m~talled mto ffiW~Pm~rr'~od buck with <br />1 galvanIzed roofing naIls through the naIl fin every ~Et' ~rp~mymemahe was used as <br />a sealant under the nail fin and around the exterior perimeter. <br />MA'l 2 1 2003 <br /> <br />Building & Zoning \nslJectlUll 1M' lax..fL. <br /> <br />Examiner SIgnature <br />License No. <br /> <br />----.- <br /> <br />,-,' <br />