My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
06-5447
Zephyrhills
>
Building Department
>
Permits
>
2006
>
06-5447
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 4:22:02 PM
Creation date
5/9/2007 8:49:05 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
06-5447
Building Department - Name
ZANIOS,CHRIS
Address
5611 1ST ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />SCJf.JlQ:YE(j{ Roofing, Inc. <br /> <br />8949 Gall Boulevard, Zephyrhills, FI33541 <br />PH: (813) 782..Q920 & (3S2) 567-8S80 Fax: (813) 715-4875 <br />STATE CERTifIED BUILDING AND ROOfING CONTRACTOR #CB-C0598 I 7 and #CC-C058134 <br />SERVING FLORIDA'S FINEST HOMES & BUSINESSES SINCE 1976 www.schaperconstruction.com <br /> <br />Date: 2/8/2006 <br /> <br />Phone: 813-782-4866 <br /> <br />Fax: <br /> <br />Name: ZepmT Point Apartments / Chris Zanios <br /> <br />Contact: <br /> <br />Address: 5611 1st Street <br /> <br />Unit # 10,11 & 12 <br /> <br />City Zephyrhills <br /> <br />State FL <br /> <br />Zip 33542 <br /> <br />Parcel # <br /> <br />We hereby propose to furnish materials and labor necessary for the completion of: <br /> <br />Shingle Re-roof <br /> <br />1. For the shingled portions of the home, remove old roofmg materials to dty-in, taking precautions to <br />, <br />protect the building and the landscaping. Groom the deck and reset the existing decking nails. <br /> <br />2. Replace bad wood other than herein agreed to at <br />materials marked up at a 30 <br /> <br />38.50 dollars per man-hour plus <br />percent contractor's tee. <br /> <br />3. Install <br />4. Install <br /> <br />aluminum <br /> <br />two <br /> <br />eaves drip with all edges sealed with plastic cement. <br />layer(s) of AS1M 15-lb asphalt shingle Wlderlayment. <br /> <br />5. <br />6. <br /> <br />Install galvanized valley metal for the length of all valleys. Valleys will be closed. <br /> <br />Install new lead boots over vent pipes and replace metal vents with new. <br /> <br />Chalk lines shall be struck to assure proper shingle exposure. <br /> <br />Install 25 Year 3 -tab Class, a self-sealing fungus resistant fiberglass shingle. <br />Manufacturer: Ce,,~it\-f("~d ~ Color: J _..bifl <br />we"-~r~ we; cD <br />Six 1-114" corrosion resistant nails shall be installed per manufacturers ins~cti6~~. <br /> <br />"7 <br />I. <br /> <br />8. <br /> <br />9. <br /> <br />OPtions <br />Hunicane-nail the deck to the rafters to meet current SBCCI code. * <br /> <br />Install <br /> <br />o <br /> <br />feet of <br /> <br />aluminum ridge vent. * <br /> <br />"See Pricing Section <br /> <br />[3part] SHINGLE RE-ROOF CFI.doc <br /> <br />Page 1 of2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.