Laserfiche WebLink
<br />SCJ{)I<PEfj{ Roofing, Inc. <br /> <br />Shingle Re-roof continued. . . <br /> <br />Schaner Roofinsz. Commitment to Qualitv <br /> <br />-All work shall be carefully supervised and completed by workmen skilled and knowledgeable in methods needed to <br />produce high quality work. <br />eThe joh gite ghall he kept clean daily for the duration ofthe job and the groundo; ghall he left cleRn of all roof related <br />debris after completion. <br />-The yard shall be swept with a magnet. <br />-The contractor shall provide permit, worlr..man compensation, and general liability insurance. <br />-Carpentry, authorized change orders and work, which are not covered under the scope of work outlined herein, shall be <br />performed on a time and material basis unless otherwise agreed upon. <br /> <br />MANUFACTURER & CONTRACTOR \VARRANTY (S) <br />Upon completion of the work and payment of all monies owed, Contractor shall issue: <br /> <br />1. A <br /> <br />5 <br /> <br />year warranty for workmanship limited to leaks caused by any component installed by the contractor. <br /> <br />2. Shingle manufacturer shall provide a <br /> <br />25 <br /> <br />year limited warranty. <br /> <br />I <br />I Visible T & M AlI0wance------_~~~~~~~___ $1 None Included <br />$ 4,500.00 <br /> Shingle Re-roof as described herein----------------___________________________ <br /> Modifications ~ $ <br /> $ <br /> TOTAL AGREED lJpON CONTRACT PRICE, LABOR AND MATERlAL-------------____ $ 4,500.00 <br />I TERMS 25% Down, Balance upon completion. <br />I <br /> <br />Price Valid For Thirty (30) Days <br /> <br />Collection costs if any, together with interest shall be added to the contract price if payment default occurs. <br />Cancellation of the contract after the 72-hour grace period shall incur a nominal fee. <br /> <br />~~t b . Dare <br /> <br />Schaper RoofIng, Inc. Representative <br /> <br />2/8/2006 <br /> <br />I accept the abov <br /> <br />ce and terms; you are authorized to begin work. <br /> <br />Signed <br /> <br /> <br />Date <br /> <br />Z III /t) b <br /> <br />Signed <br /> <br />[3part] SHINGLE RE-ROOF CF!.doc <br /> <br />Page 20f2 <br />