My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
06-5460
Zephyrhills
>
Building Department
>
Permits
>
2006
>
06-5460
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 4:21:58 PM
Creation date
5/9/2007 9:07:28 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
06-5460
Building Department - Name
MURPHY OIL USA
Address
7623 GALL BV
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~, <br /> <br />,;.~ <br />, 1 <br /> <br />" <br />. I <br /> <br />One Point Financial, LLC. <br />2662 Holcomb Bridge Rd. Suite 322, Alpharetta, GA 30022 n0-552-9505 (O)n0-552-9504 (F) <br /> <br />Sub ContractinG Aoreement <br /> <br />This agreement is between Tara Construction Co.. Inc..lTCC) located at 422 Tlmbetwood Trail. Oviedo FL <br />32765 and One Point Financial.LLC. (OPF) beginning on this day of October, 2005. Tile attached e mail <br />dated September 29"', 2005 from Gregg Fowlkes is to be considered part of this agreement herein. The scope of <br />this project includes obtaining proper permits and complete the specified Usite workB in the state of Florida for the <br />installation of A TM machines and kiosks for OPF. <br /> <br />The followina structure is for work and Dermits within the allotted 75 mile radius/realon from Ovieda. as <br />outlined in the attached email: _ <br /> <br />1. Permit Applications for the state of Florida ...... ... ... ... ............... ...... ... ..:... ......... '........ each @$500.00 <br /> <br />2. -Common/standardB pad- 4' x 6', including installing 2 guard posts......... ...... ................. ..each. $500.00 <br /> <br />- To include all materials and specifications as outlined in architectural drawings <br />- To include all site clean-up upon completion for each site <br />- Digital photos to be e mailed to OPF, atb1: Suel Bowen at job completion <br /> <br />3. Bollards/Guard posts to be "extra" cost, to be paid for by OPF @ $55.00 per post <br /> <br />-Purchased locally by TCC, to be reimbursed by OPF, and installed per plans <br /> <br />4. Required painting as per drawing (including painting each Bollard)...... ......................__ ...... .$125.00 per site <br /> <br />NOTE: Yellow "directional- lines must meet specifications. Master stencil supplied by OPF for the necessary <br />-letters/arrow" . <br /> <br />5. Larger, Alternate/Island drive up pad and curbing, per detailed specification (similar to McDonough, GA plan) <br />including installation of6 Bollards, curbing, 4' x 6' pad for kiosk, etc... ... ... ... ... ... ,'....... ............ .., @$1,35O.00 <br /> <br />NOTE: Obtaining permits for these sites, to be same cost @$500.00 <br /> <br />-Larger Island to Include: 4 x 6 Common/standard pad- (same as McDonough, GA site work- see photos) <br />-Curbing to meet specifications provided <br />~irt fill,' pine straW cc:iver ' <br />- concrete, rebar. curb specs, guard posts to meet drawing specifications <br />-General clean-up upon completion of project <br />-Digital photos e mailed to Suel Bowen for final payment <br /> <br />6. TCC agrees to -manage- the necessary Florida Ucensed electrical sub contractors for each pre determined <br /> <br />site....................................... ...... .......................................... ...... ............................... $150.00 per site. <br /> <br />NOTE: TCC will coordinate a local licensed electrician and ensure proper electrical and communication <br />lines to be pulled for each site. The electrician is responsible for pulling permits for each site, providing receipts/copy <br />of site permit and completion photos to Suel Bowen via fax or e mail. The electrician is responsible for all costs. <br />labor, etc. and will provide OPF a written bid for each site. <br /> <br />All pricing includes travel, gas, lodging, etc. within the 75 mile area. <br /> <br />No additional payment allotted for fuel, meals or lodging. <br /> <br />ALL PERMIT APPLICATION FEES TO BE REIMBURSED BACK TO TARA CONSTRUCTION CO. <br />Tara Construction Co. to fumish One Point Financial with actual receipts per site. <br /> <br />tr/~:d <br /> <br />t2000SLnSt : 01 <br /> <br />:wo~~ ~S~:60 9002-tt-N~r <br />
The URL can be used to link to this page
Your browser does not support the video tag.