Laserfiche WebLink
<br />-, <br />" <br />."\ <br /> <br />,,;:iJ <br />~. <br />\ <br /> <br />One Point Financial, LLC <br />Subcontracting Agreement <br />Pg.2 <br /> <br />SECURING OF PERMITS OUTSIDE THE INITIAL 75 MILE RADIUS <br /> <br />TCC has agreed to obtain required permits outside the 75 mile area of interest, on a $500.00 per site + travel <br />expenses basis... ....... Travel expenses are defined as $.15 per mile. meals, and motel, IF NECESSARY.) <br /> <br />The additional travel cost will NOT exceed $200.00 Der sitelD8flllit, outside the 75 mile radius. <br /> <br />NOTE: We suggest that when obtaining pennit8 in "remote" locations (outside the 75 mile radius), multiple <br />permits are filed for and obtained in order to reduce travel time and expense. ( <br /> <br />_ ,.: TCC will supply OPF with. receipts of ,all travelexpenses,.etc, ., <br />- TCC will provide receipts for each permit, per site, for reimbursement <br />- TCC will provide OPF with copies of permits <br /> <br />TCC agrees to allow our sub contractors to complete the necessary Dsite workD. per specifications, for each location <br />that TCC has obtained a permit TCC will simply be responsible for providing OPF with the permit. (TCC is NOT <br />responsible for completing any site work, clean up, material costs, labor, etc. at locations that are completed by OPF <br />subcontractors outside the 75 mile radius... TCC is relieved of any liability for site work.) <br /> <br />ADDITIONAL NOTES: <br /> <br />1. All correspondence should be either faxed to and/or e mailed to the attention of Suel Bowen. (f}770- <br />552-9504. Email addresssuel@aDsatm.com <br />2. Terms. 50% prior to start of permit process. 50% balance due upon completion of work. <br />3. 100% immediate reimbursement for permit costs, upon receipt of permit costs from TeC. <br />4. Copies of all permits must be submitted to the attention of Suel Bowen. <br />5. Final payment will be issued immediately upon receipt of a digital photo of the completed site work. <br />(NOT including electrical work.) <br />6. TCC agrees to "manageD their electrical sub contractors for each site. and make sure that the specified <br />power/communication specifications are met, including proper permits for each location. <br />7. Electrical sub-mntractors will bill OPF directly, and be paid directly by OPF. <br />8. Electricians are responsible for supplying all permits. etc. directly to OPF. <br />9. Electrician is responsible for submitting digitaJ photos of completed work, in order to receive final <br />payment for each site. <br />10. Any additional expenses, charges, material costs, or variations/deviations from this price structure and <br />agreement MUST submitted in writing, and approved by OPF officer. All approvals will be in writing, with <br />support documentation 'provided. - -_..- - , h __H --~'" --- <br /> <br />Agreed upon by: <br /> <br /> <br />Tara Construction Co., Inc. <br /> <br />Glfe1' f;wllL:~> <br />Na"';tlro ~ <br />Signature of o'~ <br />/tJ - /3 - 0 5 <br />Date <br /> <br />v/v:d <br /> <br />l21211211218L~l8l:0.l <br /> <br />:WO~~ ~S~:6121 91211212-ll-N~r <br />