Laserfiche WebLink
<br />SCKjlff,(j{ Roofing, Inc. <br /> <br />Shingle Re-roof continued. . . <br /> <br />Schaper Roofin2. Commitment to Qualitv <br /> <br />-All work shall be carefully supervised and completed by workmen skilled and knowledgeable in methods needed to <br />produce high quality work. - <br />eThe joh site shall he kept clean dai'y for the duration of the joh and the ground..<; shan he 'eft clean of an roof relm:ed <br />debris after completion. <br />. The yard shall be swept with a magnet. <br />-The contractor sh..all provide permit, workma..Tl compensatiot'l.., a..Tld general1iability in.su..rance. <br />-Carpentry, authorized change orders and 'Work, which are not covered under the scope of work outlined herein, shall be <br />performed on a time and material basis unless otherwise agreed upon. <br /> <br />~~..k~UF ACTURER & CONTRACTOR W ~l\.-lTY (8) <br />Upon completion of the work and payment of all momes owed, Contractor shall issue: <br /> <br />1 ^ <br />1. .n. <br /> <br />" <br />J <br /> <br />year w&--ranty for workmanship limited to leaks caused by any component installed by the contractor. <br /> <br />') <br />.., <br /> <br />Shingle manufacturer shall provide a <br /> <br />30 <br /> <br />year limited warranty. <br /> <br />, <br />, <br /> <br />I <br />I CONfRACf PRICING <br /> <br />I '1isilDle 1L ~ 1v1 l\llovv~ce---------------------------------------------------------------------- <br /> <br />I Shingle Re-roof as descrilDed herein--------------------------------------------------------- <br />I :t\1odifications Replace 2 skylights '. <br />J <br />I <br /> <br />I TOTAL AGREED UPON CONTRACT PRICE, LABOR AND MATERIAL-------------------- <br /> <br />j TERMS 25% down, Balance upon completion. <br />I <br />I <br />I <br />I Price Valid For Thirty (30) Days <br />I <br /> <br />I <br />$1 <br />$1 <br />$1 <br />$1 <br />. I <br />$1 <br />I <br /> <br />I <br />I <br />I <br />500.00 I <br />I <br />4.245.00 I <br />. Inc. I <br />I <br />4,745.00 I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Collection costs if any, together with interest shall be added to t.'1e contract price if payment default occurs. <br />C~cellation of the contract after the 72-hour grace period shall incur a nominal fee. <br /> <br />%lJ t- ~, ~ " Dare <br /> <br />SclJaper Roofing, 1m:. Repn~stmtative <br /> <br />3/27/2006 <br /> <br />I accept the above price and terms; you are authorized to begin work. <br /> <br />Signed ~~~J .<3 ' ~ <br /> <br />Date <br /> <br />~/I-<C1 0(0 c'J~ <br /> <br />Signed <br /> <br />BooLlL30 032706 <br /> <br />?~q:e0'€ & <br /> <br />\:)e~c>/+ <br /> <br />~t'..) \)lOQ.Q() tar0 VtSa. <br />J_Il)~Ok ~h.l. <br /> <br />Page 20f2 <br />