Laserfiche WebLink
<br />SIGMA 34 & 40 INSTALLATION, TEST AND <br />ACCEPTANCE PROCEDURE <br />ITA-34-902130 Rev S <br /> <br />Perry Baromedical Corporation <br /> <br />TABLE OF CONTENTS <br />SECTION 1JTLE PAGE <br />1.0 INTRODUCTION 3 <br /> 1.1 Purpose 3 <br /> 1.2 Scope 3 <br /> 1.3 Prerequisites 3 <br />2.0 INSTALLA nON 3 <br />3.0 INTERCONNECT PRESSURE CHECKS 3 <br />4.0 PRESSURIZATION AND EXHAUST SYSTEM 4 <br />5.0 GURNEY AND STRETCHER 4 <br />6.0 COMMUNICA nONS SYSTEM 4 <br />7.0 ACRYLIC 5 <br />8.0 AIR SAMPLES 5 <br />9.0 VISUAL INSPECTION 5 <br />10.0 PERFORMANCE TESTING 5 <br />11.0 TAMPER SEALS 6 <br />12.0 TRAINING OUTLINE (WI-L3-903123) 6 <br /> CHAMBER PERFORMANCE INSTALLATION TEST 7 <br /> CHAMBER CYCLE INST ALLATON TEST 8 <br /> INSTALLATION CHECKLIST 9 <br /> <br />Notice: The only contn:lllMl copies of this document ate the electronic: read-only versions located on "F" dIive. <br />and the signed master copy m"ntllned by the Quality department. The document user Is ....pon.lbIe for verifying that the latest <br />version Is available for use, by checking the .electronic directory to detltnnine the current revision level before using Level 3 or <br />Level 4 documents. Page 2 of g <br />