My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
06-6337
Zephyrhills
>
Building Department
>
Permits
>
2006
>
06-6337
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 4:16:52 PM
Creation date
6/20/2007 2:17:56 PM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
06-6337
Building Department - Name
CERVALLOS,JUAN
Address
6215 ABBOTT STATION
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />SIGMA 34 & 40 INSTALLATION, TEST AND <br />ACCEPTANCE PROCEDURE <br />ITA-34-902130 Rev J <br /> <br />Perry Baromedical Corporation <br /> <br />3.1 Pressurization supply line. <br />3.1.1 Open pressurizing gas isolation valve. <br />3.1.2 Check all interconnect lines and fittings for any leaks - tighten as necessary. <br />3. 1.3 Close isolation valve. <br /> <br />3.2 Exhaust Line <br />3.2.1 Check that exhaust line is connected to the chamber and the wall connection and <br />clamps are installed. (Single exhaust per chamber) <br /> <br />3.3 Ground Wire <br />3.3.1 Check that the ground wire is properly connected to the chamber and to the facility <br />wall connection. <br /> <br />Initials: Perry ~ Customer [~ <br /> <br />4.0 PRESSURIZATION AND EXHAUST SYSTEM <br />4.1 Check that main pressurization supply is turned on to chamber. <br />4.2 Tum system on. Verify that door interlock switch is operating satisfactorily. (No Oxygen <br />flow unless door is closed.) <br />4.3 C10se chamber door. <br />4.4 Close vent rate control knob. <br />4.5 Set the rate control knob for Maximum Flow. <br />4.6 Set the set pressure control knob to approximately 31 psig. <br />4.7 Check that chamber pressure starts to increase. <br />4.8 Adjust chamber pressure to 30 psig. <br />NQIE: Chamber pressure will be approximately 1 psig less than set pressure. <br />. 4.9 Demonstrate operation of Exhaust Bypass button. <br /> <br />Initials: Perry vA:. Customer [iJ- J <br /> <br />4.10 <br /> <br />(Optional - For chambers instal/ed with BIBS systems) Check BIBS connections and verify <br />system operation.. <br /> <br />4.11 <br /> <br />Explain BIBS oxygen monitor operation and calibrate. <br /> <br /> <br />Perry ~!If CusIDmer I <br /> <br />Initials: <br /> <br />Notice: The only controlled copies of. this document ... the electronic read-only versions loc:atec:I on -P' drive. <br />and the signed muter copy maintained by the Quality department. The document ....r Is ruponslbl. for verifying that the I.test <br />version is avail.ble for use, by checking the electronIc directory to determine the current revision level before using Level 3 or <br />Level 4 documents. Page... of I <br />
The URL can be used to link to this page
Your browser does not support the video tag.